My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00428
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00428
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:49:58 PM
Creation date
10/4/2006 6:38:00 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/29/1999
Description
Summary Minutes and Record of Decisions - March 29-30, 1999
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />e <br /> <br />e <br /> <br />2Ie. Colorado River Basin Issues - Upper Colorado River Commissioner's Report <br />Tape 5, Start/Stop: 0000 - 0000 <br />Action: TIris item was not addressed. <br /> <br />21f. Colorado River Basin Issues - Glen Canyon Adaptive Management Program - Status <br />Report <br />Tape 5 Start/Stop: 0014 - 0231 <br />Action: TIris was an informational item; no action taken. <br /> <br />(note...due to a typographic error on the agenda, there was no item 2Ig or h) <br /> <br />2li. Colorado River Basin Issues - Animas-La Plata Project - Status Report <br />Tape 5, Start/Stop: 0231 - 0458 <br />Action: TIris was an informational item; no action taken, <br /> <br />2Ij. Colorado River Basin Issues -I5-Mile Reach ESA Section 7 Consultation - Status <br />Report <br />Tape 5, Start/Stop: 0458 - 1566 <br />Action: TIris was an informational item; no action taken. <br /> <br />2Ik. Colorado River Basin Issues - Endangered Fish Recovery, Instream Flow Water <br />Rights Applications -IS-Mile Reach and Yampa - Status Report <br />Tape 5 Start/Stop: 1566 - 1688 <br />Action: TIris was an informational item; no action taken. <br /> <br />211. <br /> <br />Colorado River Basin Issues - Ruedi Reservoir - Proposed contract for releases of <br />21,650 AF to endangered fISh in the IS-Mile Reach <br />Tape 5, Start/Stop: 1688 - 1924 <br />Action: A motion was made by David Smith to accept the staff recommendation to <br />proceed with the contract for one more year, for 21,650 AF, and with the <br />following amendments: 1) in Item I, a paragraph he added defining <br />regulatory storage; 2) in 3A, the Article 8 reference, remove "8" and make it <br />"Article 1 "; 3) in 3B, add a phrase that says "and in compliance with the <br />Fryingpan Arkansas Project Operating Principles". The motion was <br />seconded by Eric Kuhn and approved unanimously (8-0). <br /> <br />21m. <br /> <br />Colorado River Basin Issues - Grand Valley Water Management Project - Status <br />Report <br />Tape 5, Start/Stop: 1929 - 2277 <br />Action: TIris was an informational item; no action taken. <br /> <br />Minutes March 29-30, 1999 <br />Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.