My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00427
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00427
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:49:57 PM
Creation date
10/4/2006 6:38:00 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/21/2001
Description
Flood Section - South Platte River Channel Project, Right-of-Way Action by the South Suburban Park and Recreation District for the Union Avenue Pedestrian Bridge, Littleton, Colorado
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, . <br /> <br />J'?'A";tl""i.'~, n if'" . <br />,. '10-' i""~..)i~,, "'" ...< ... <br />.J . <br />Board 01 DIrectors <br />Jame. J. Ryan III <br />Cila/tman <br />ROl:lIJrto F, G1IUs <br />ChOr/&> E. Stroh . <br />Robert Ftoncola <br />Dennis S. Revnolds <br />Executive Director <br />David A, lorel12 <br /> <br /> <br /> <br />'tl o\)J::HJ.\t):)l\I.~ l\.LJill...l.l'l <br /> <br />L~ South Suburban <br />~y Park and Recreation tlistrlct <br />'-'" Admlnlstrallve OlflcG <br />6631 S. Unllle"lfy8Ivd. 303/798-5131 <br />Littleton. CO 8Q121 Fox: 303{798.aOW <br />. www..sprd.org <br /> <br />November 7, 2000 <br /> <br />Mr. Larry Lange, Chi~fPhysical Science Researcher <br />Colorado Water Conservation Board <br />1313 Sherman, Room 7Z1 <br />Denver, Colorado 80203 <br /> <br />Dear Larry: <br /> <br />.-....J <br /> <br />[ ll111 writing on behalf of the South Suburban Park Foundation. The Foundation is <br />currently under contract to build the next section of concrete path along Big Dry Creek at <br />its confluence with the South p,latte River. This section of trail improvements should be <br />incorporated into the District's existing recreation easement with eWeB. <br /> <br />CWcB property will be involved in the plan to connect Big Dry Crllek Trail to the west <br />side of the river, Le" to the Mary Carter Greenway Trail. This connection involves a 10 <br />foot wide, 200 foot pedestrian bridge. Initial engineering has elimir..ated the, need for a <br />center pier, therefore plans are to free-span a distance of 200 feet, bunk-to-bank, In <br />addition, there will be approximately 100 feet of 10 foot wide concrete trail installed on <br />the east bank of the dver, again inside CWCB property. On the we!lt bank ,)fthe river we <br />will be modifYing the existing concrete path to accommodate approaches tel the <br />pedestrian bridge, <br /> <br />. <br /> <br />Please note that RBI. Inc. is currently under contract for the construction of the concrete <br />path for the east sidel of the river. Could I possibly receive your vel'blil authorization to <br />install the 100 feet Clfpathway. possibly as early as the week ofNovcmbcr 131 Your <br />understanding and assistance with this request would be gratefully apprecillted, <br /> <br />'-..r <br /> <br />Enclosed is a plan produced by McLaughlin Water Engineers. I ha.ve indicated by blue <br />pencil line the boun.dary of the CWCB property. Again, thank you for yotlr help in this <br />project. Please call me ShOU(OU hav. e additional questions regarding our request. <br /> <br />Sincerely, &um4$ C . <br /> <br /> <br />H. Wm. Woodcock: <br />Manager of Planning and Construction <br /> <br />/ <br />cc: ~.Ohn Pflaum, McLaughlin <br />v~ Bob Seams, Urban Edges, Inc. <br /> <br />. <br /> <br /> <br />",lo...... ""_.. lV...,lnJu,J n,.,u Medal WinnEtr for ~ellenc.t in Pork and RecreatiDn Managemen.t <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.