Laserfiche WebLink
<br /> <br />IJ In the interim, Omaha District has been participating in briefing meetings solely as an <br />observer. <br />IJ A pre-final review meeting has been scheduled for 2 April to discuss the draft report. <br />The final report will be made available in April 2003. <br />IJ Colorado Water Conservation Board has requested that the State and Corps perform <br />a joint Probable Maximum Flood (PMF) analysis using the revised PMP data, under <br />the Section 22, Planning Assistance to States, authority. Before proceeding, Omaha <br />District would need to obtain the approval of Congressmen Thomas Tancredo and <br />Jocl Hefley. Estimated PAS study cost is $200,000. <br /> <br />CONSTRUCTION GENERAL FUNDING <br />CONTINUING AUTHORITIES PROGRAM <br />Emerl!encv Streambank Protection (Sec. 14 1946 FCA) <br />27'h Street, Glenwood Springs (Roaring Fork River) - $150,000 -- $245,000 - Dec 03 <br />IJ Armor banks and bridge piers; severe scouring and erosion <br />IJ Complete Planning and Design Analysis (PDA) Mar 03 <br />IJ Initiate construction Sep 03; complete construction Dec 03 <br />IJ Estimated total project cost: $648,000 ($558,000 construction cost) <br /> <br />McInnis <br /> <br />Small Flood Control Proiects (Sec. 205. 1948 FCA) <br />Willow Creek, Creede - $0 -- $0 - No current schedule <br />IJ Address deteriorating COE-constructed grouted stone flume through town. <br />IJ Project temporarily on hold (lack of sponsor funding). Sponsor does not have <br />sufficient funds to proceed with the cost-shared feasibility study ($400,000), <br />plans and specifications ($200,000) or construction ($2.0 million). <br />IJ Estimated total project cost: $2.6 million. The sponsor's <br />share of project costs would be approximately $975,000. <br /> <br />McInnis <br /> <br />Van Bibber Creek, Arvada - $803,000 -- $4.0 million - Jun 03 Beaprez <br />IJ The project is a flood damage reduction channel improvement project beginning <br />at the ball fields on Oak Street west of Kipling and proceeding easterly along 58th <br />Street, through the Arvada Shopping Center, before discharging back to the Creek. <br />IJ Project features include 2,800 feet of unlined, open channel; 900 feet of reinforced concrete-lined open <br />channel; and 1,500 feet of twin reinforced cast-in-place concrete box conduit. <br />IJ The estimated project cost is $12.0 million. <br />IJ PCA was executed in Apr 02. <br />IJ Corps is reviewing City of Arvada's (sponsor) real estate acquisition documentation. <br />IJ Start construction Jnn 03; complete construction Sep 05. <br /> <br />Aquatic Ecosvstem Restoration (Sec 206. WRDA 1996) <br />Arkansas River, Pueblo Fisheries Habitat Restoration - $412,000 -- 2,300,000 - FY 05 McInnis <br />IJ IO mile-long restoration project on the Arkansas River from Pueblo Darn to the <br />1-25 crossing downstream of Pueblo. Features include a 2,500 foot-long fish ladder/ <br />passage comprised of ca. 60 boulder clusters (each cluster 4 8-foot diameter boulders) <br />to create pools and riffles for fish habitat. Other features include 10 W-weirs for grade <br />control, and 20 J-hooks to stabilize outside stream banks and minimize erosion. To build up <br />the inside banks, a series of vegetated sand bars will be constructed. They consist of I-foot layers <br />of sand wrapped in geotextile blankets and placed stair-step fashion against the bank. Cottonwood <br />and willow pole plantings will be placed to create wetlands and restablish riparian vegetation. <br />IJ Complete P&S Apr 03 <br />IJ Initiate construction Sep 03; complete construction Sep 04. <br />IJ Total estimated project cost: $6.9 million ($5.8 million construction cost) <br /> <br />3 <br />