My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00377
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00377
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:49:40 PM
Creation date
10/4/2006 6:37:32 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
6/25/1963
Description
Table of Contents, Agenda, Minutes and Resolution
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />On the studies of the possible integration <br />with the eastern slope facilities of the Frying- <br />pan-Arkansas Project and the Homestake Project, <br />which is a private development as you know, that <br />work has been going on and we expect to start <br />actual negotiations with the cities in the next <br />week or so at which time we can begin to firm up <br />the possible plans that may be utilized for those <br />integrations of the eastern slope features of <br />those two projects. Those discussions will be in <br />detail at that time. of course we have had gen- <br />eral discussions before, in the past, on it. <br /> <br />We've also initiated negotiations with the <br />State Engineer's office on the coordinating of <br />the river losses that will be occasioned in <br />transportation of water down through the Arkansas <br />River. We are getting that work started and <br />worked out. <br /> <br />We've also initiated studies on the storing <br />of Arkansas River winter water in the Pueblo <br />Reservoir. These are all preliminary studies <br />and analyses necessary to the preparation of <br />final designs of the project. <br /> <br />I <br /> <br /> <br />..- <br /> <br />In our Denver Development Office the work on <br />the Narrows Reservoir continues and there it has <br />been concentrated principally on the survey by <br />the Colorado Water Conservation Board as to the <br />interest of downstream water users in purchase <br />of water from either of the two sites that may <br />finally be selected. I have no recent informa- <br />tion on that because actually the survey is being <br />run by the Board and perhaps the Director will <br />comment in more detail on that later. From news- <br />paper reports it appears that there is in the <br />neighborhood of 67,000 acre-feet that have been <br />tentatively signed up, not contractually but to <br />indicate their interest in the purchase of water <br />from a reservoir on the main stem. The latest <br />one to sign up such an indication would be the <br />North Sterling Ditch Company which is one of the <br />largest users down the river. <br /> <br />There have been a number of meetings down <br />there on the Narrows project amongst the local <br />
The URL can be used to link to this page
Your browser does not support the video tag.