Laserfiche WebLink
<br /> <br />. <br /> <br />. <br /> <br /> <br />. <br /> <br />The 22 potential storage sites where screened based on operational effectiveness, <br />permitting challenges, and cost. The screening process resulted in the formulation of <br />three basic alternatives that can be evaluated as "stand alone" projects or combined. The <br />end result was the formulation of 6 alternatives, which are summarized below: <br /> <br /> <br />Alternative Description Developed Construction Cost of <br /> Sunnlv (1) Cost Sunnlv (2) <br />I Development of a 10,000 acre- 7,600 af/yr $13,740,000 $133/af <br /> foot conventional dam and <br /> reservoir at a site west of <br /> Julesburg Reservoir and the <br /> 5,800 acre-foot Ovid ring-dike <br /> site, Water supplied by gravity <br /> from the North Sterling system <br /> and Peterson svstem. <br />2 Julesburg Reservoir enlarged by 10,600 afiyr $21,240,000 $140/af <br /> 10,000 acre-feet in combination <br /> with the Ovid ring-dike project <br /> at 5,800 acre-feet. Water <br /> supplied by gravity from <br /> Harmonv and Peterson svstems. <br />3 Development of a 10,000 acre- 10,600 af/yr $14,440,000 $103/af <br /> foot conventional dam and <br /> reservoir and the 5,800 acre-foot <br /> Ovid ring-dike site. Water <br /> supplied by pumping from the <br /> Harmony system and by gravity <br /> from the Peterson svstem. <br />4 Julesburg Reservoir enlarged by 7,800 af/yr $22,400,000 $ 189/af <br /> 15,000 acre-feet with gravity <br /> sunnlv from Harmonv svstem. <br />5 Ovid ring-dike at 5,800 acre-feet 4,600 af/yr $5,300,000 $84/af <br /> with gravity supply from <br /> Peterson svstem, <br />6 Conventional dam and reservoir 6,000 af/yr $9,100,000 $116/af <br /> located upstream of Julesburg <br /> Reservoir with 10,000 acre-feet <br /> of storage supplied by the <br /> Harmonv svstem, <br /> <br />(ll Based on storage vs. supply analyses for 1943-97 period. <br />(2) Based on construction cost offacilities amortized at 3.5 % for 30 years (CWCB loan terms) <br />and all recurring O&M, energy, and conveyance charges, <br /> <br />8 <br /> <br />I <br />