Laserfiche WebLink
<br /> <br />. <br /> <br />. <br /> <br /> <br />Table 1 <br />Cost of Potential Surface Storage Projects <br /> <br /> Crest <br /> Storage Length Dam Height Dam Volume Volume Preliminary Unit Cost of <br />Potential Slto. Volume (AF) (Feet) (Feet) (eY) Ratio (1) Cost Storage <br />Previously Identified Sites . <br />Ovid Reservoir Ring-Dikes on North Side of River <br />Alt~mative 1 3,980 15,400 20 748,000 188 Not Estimated <br />Alternative 2 5,770 15,400 25 1,328,000 230 $5,290,000 $920 <br />Sedgwick Resorvolr 2,230 15,000 15 520,000 233 $2,850,000 $1,280 <br />Sustainment Project sites Conventional Sites on So. Side of River <br />LSP Site A 1,580 1,800 40 320,000 203 $4,020,000 I $2,540 <br />LSP Sile 8 1,030 2,600 40 345,000 335 Not Estimated <br />LSP Site C 1,450 1,700 40 288,000 199 Not Estimated <br />Julesburg Enlargement (2) Enlarge Existing Rservoir <br />Alternative 81 5,300 (31 (3) 437,000 82 $13,800,000 $2,600 <br />Alternative C1 10,100 (3) (3) 616,230 61 $16,100,000 $1,590 <br />Alternative C2 10,800 (3) (3) 894,000 83 $19,500,000 $1,810 <br />Alternative C3 21,900 t3) (3) 1,700,000 78 $25,100,000 $1,150 <br />Potential New Conventional Sites on North Side of River <br />Cottonwood Creek 4,000 2,600 60 638,000 160 $7,150,000 $1,790 <br />Johnson 10,600 4,300 70 1,200,000 113 $11,820,000 $1,120 <br />Harmony Ditch West 10,000 4,400 50 834,000 83 $8,420,000 $840 <br />Hawk Springs (Duck: Cr.) 3,500 2,300 50 307,000 88 $4,230,000 $1,210 <br />Sterling Lateral East 4,900 3,000 50 553,000 113 $6,080,000 $1,240 <br />Sterling lateral South 6,600 3,900 40 684,000 104 $6,830,000 $1,030 <br />Sterling lateral West 6,900 3.800 40 554,000 80 $5,890,000 $850 <br />No. Sterll~g Regulating 7,600 6,100 65 2,304,000 303 $19,800,000 $2,610 <br />Ramsey Draw 2,900 2,100 50 407,000 140 $4,930,000 $1,700 <br />Corral Creek A 9,000 4,700 70 1,040,000 116 $10,840,000 $1,200 <br />Corral Creek B 2,500 2,100 50 377,000 151 $4,7S0,OOO $1,900 <br />Skinner Draw 5,400 1,900 60 469,000 87 $5,530,000 $1,020 <br />potenlial'New Ring-Dike Sites on North Slde.,of River . <br />Gerk 5.000 13,800 5S 4,900,000 980 $18,720,000 $3,740 <br />Troelstrup 5.000 17,650 30 1,950,000 390 $8,640,000 $1,730 <br />Potential New Conventional Sites on South Side of River <br />Johnson lake Enlargement 5,400 2,600 80 2,610,000 483 $21,500,000 $3,980 <br />Johnson lake West 3,500 3,500 60 1,420,000 406 $12,620,000 $3,610 <br /> <br />. (1) Embankment Volume in cubic yards (CY) divided by Storage Volume in acre~feet (AF) <br />(21 Costs from 199a W, W, Wheeler study escalated by9%. <br />(3) There are several dams and configurations involved in the dam raising project; therefore, these data <br />are not summarized here. <br /> <br />7 <br /> <br /> <br />I <br />