Laserfiche WebLink
<br />~ <br /> <br />; <br /> <br />detention pond located on the south side of Frederick be enlarged to a regional detention pond, to <br />mitigate future flood damage to the surrounding communities. The regional detention pond tit <br />would encompass over 60 acres of land and store approximately 146 acre-feet of stormwater <br />during a 100-year event. The design is being completed by the Sears-Brown Group in 2000, willi <br />construction tentatively scheduled to commence in the February of 2001. <br /> <br />e <br /> <br />e <br />