|
<br />.S.UMMARY TABLE - CONSTRUCTION COSTS OF SELECTED RESERVOIRS - CONSTRUCTED, UNDER
<br />CONSTRUCTION AND PROPOSED
<br />
<br /> NAME OF PROJECT CONSTRUCTION CAPACITY CONSTRUCTION
<br /> RESERVOIR COMPLETED (Acre-Feet) COST
<br />A. CONSTRUCTED RESERVOIRS
<br />Silver Jack Bostwick Park 1971 14,000 $ 9,800,000
<br />Vega Colbran 1960 33,000 4,100,000
<br />Rifle Gap Silt 1967 13,600 4,934,000
<br />Cralolford Smith Fork 1962 l4,400 3,36l,000
<br />Lemon Florida 1963 39,000 8,200,000
<br />Va11ecito Pine River 1941 30,000 3,500,000
<br />Ruedi Fryingpan-Arkansas 1968 l02,400 22,911,500
<br />Pueblo " " 1977 357,000 72,000,000
<br />Turquoise " " 1969 129,400 lO,l63,000
<br />Horsetooth Colo. Big Thompson 1949 l51,800 l2,600,000
<br />Grandby " " " 1950 539,800 12,900,000
<br />Bonny Armel Unit 1951 l70,200 lJ,300,000
<br />Yamcolo Yamcolo 1980 9,000 6,400,000
<br />B. RESERVOIRS UNDER CONSTRUCTION
<br />
<br />Ridgeway Da 11a s 80,000 56,500,000
<br />McPhee Dolores 381,000 74,l02,000 1
<br />Twin Lakes Fryingpan-Arkansas l41,000 2l,OOO,000
<br />C. PROPOSED RESERVOIRS
<br />Cac tus Park Grand Mesa 29,000 27,500,000
<br />Salolhill Mountain Ye11Olo1 Jacket 55,000 26,600,000
<br />Pot qook Savery-Pot Hook 60,000 22,000,000
<br />Saltado San Miguel 26,000 30,000,000
<br />Soap Park Fruitland Mesa 51,400 32,000,000
<br />"larrolols Narrolols Unit 448,000 170,000,000
<br />Dominquez Dominquez 302,000 330,000,000 2
<br />Coffin top St. Vrain & Left Hand 84,000 62,000,000
<br />Geer Canyon " " " " " 25,000 46,000,000
<br />Ridges Basin Animas-LaP1ata 280,000 5l, 000, 000
<br />1 - Represents Low Bid
<br />2 - rnc ludes Power Plant & Pumpback Facilities
<br />
<br />~
<br />
|