My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00343
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00343
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:49:10 PM
Creation date
10/4/2006 6:36:25 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
10/27/1959
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />J"./VU <br /> <br />MR. PETERSON:: <br /> <br />, <br /> <br />MR. STAPLETON: <br /> <br />MR. MOSES: <br /> <br />MR. MILLER: <br />MR. STAPLETON: <br /> <br />MR. BURR: <br /> <br />MR. STAPLETON: <br /> <br />"I didn't want to interrupt, Mr. Chair- <br />man, but in connection with Mr. Miller's <br />statement, ,which I think is very fine, I <br />think the concern of Colorado needs to be <br />that when it comes down to the physical <br />construction of these lines that they should <br />be so constructed so that Colorado can re- <br />ceive this power from the large project <br />which is Glen Canyon. Now if lines are <br />constructed, and it doesn't make any dif- <br />ference by whom, that do QQi bring that <br />power into Colorado, then there is no way <br />that Colorado can get .that power. <br /> <br />Each individual power supplier in Colo- <br />rado cannot go to Glen Canyon with their own <br />line to get it; someone has to build that line, <br />into Colorado before Colorado customers can <br />get the power from Glen Canyon. Now the <br />question is - who is going to build that line <br />and when is it going to be built? Are we <br />assured it is ever going to be built?" <br /> <br />"We have many collateral problems in <br />connection wfth that and I am sure that we <br />are not going to dispose of any of them <br />permanently today so I will now ask Mr. <br />Moses if he has the resolution ready which <br />we may consider for adoption." <br /> <br />I <br /> <br />"If you will ~ealize this is a 30 second <br />resolution and I reserve the right to edit it <br />later, it is as follows: <br /> <br />'BE IT RESOLVED that the Colorado Water <br />Conservation Board urge the Upper Colorado <br />River CoIDmdssion to request the Secretary of <br />Interior that the four states of the Upper <br />Division of the Colorado River be designated <br />as the primary market area for Colorado <br />River Storage Project power.' <br /> <br />I think copies of this should be sent <br />to each of the Governors of the upper basin <br />states and to all Upper Colorado River Water <br />Commissioners." <br /> <br />I <br /> <br />"I mOVe the adoption of the resolution." <br /> <br />"It has been moved that this resolution <br />be adopted by Mr~ Miller. Is there a second?" <br /> <br />"I'll second the motion." <br /> <br />"It has been seconded by Mr. Burr." <br />
The URL can be used to link to this page
Your browser does not support the video tag.