Laserfiche WebLink
<br />" <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />OlCW__ <br />Water Division 2 <br /> <br />and the control structures. The Whitewater Park will be constructed in the Arkansas <br />River channel, beginning with the boat chute/fish ladder (Structure I) to be constructed <br />over the Power PLant Diversion. Seven other conttol structures (Structures 2 through 8) <br />will be located in the river between Structure 1 and the Union Street bridge. . The Power <br />Plant Diversion, the Union Street bridge, and the Moffat S.treet Chute (Structure 9) are <br />generally -located as follows: <br /> <br />Power Plant Diversion: (Structure 1): A water control structure located in <br />the Arkansas River channel in the SWI/4 of the NWI/4, Section 36, T. 20 S., R. 65 W., <br />of the 6th P.M., at a point approximately 2,326 JeetSouth of the North Section line and <br />810 feet Easl of the West Section line of said Section 36. <br /> <br />, Union Street Bridge: The Union Street bridge crosses the Arkansas River <br />in Pueblo in the SEI/4 of the SWI/4, Section 36, T. 20 S:, R, 65 W.,ofthe 6th P.M., at <br />points approximately 968 feet North of the South Section line and 2,320 feet East of the <br />West Section line of said Section 36 ' , <br /> <br />Moffat Street Chute (Structure 9): The Moffat Street Chute is a structure <br />in the Arkansas River channel 10t::ated in the SWI/4 of the NWI/4, Section 6, <br />T, 21. S, R. 64 W., of the 6th PM., at a point approximately 1,684 feet South of the <br />North Section line and 287 feet East of the West Section line of said Section 6., <br /> <br />5. Source. The source of the water forthe Whitewater Park is the Arkansas River <br />in Pueblo County, Colorado. <br /> <br />6. Appropriation information: <br /> <br />A. Date of ini~iation of appropriation: December 1, 1982. <br /> <br />B. How appropriation was initiated: The appropriation was initiated by <br />formation of the requisite intent to appropriate coupled with actions manifesting such <br />an intent sufficient to put third parties on notice, including but not limited to the <br />retention of engineering services for the design and construction of the Moffat Street <br />Chute, 'Additional such actions include, but are not limited to, Applicant's acquisition <br />of lands or rights to use lands for the Legacy Project; authorization by the Pueblo City <br />Council of applications for grants and funding assistance for the Legacy Project; <br />preparation of reports, design drawings, and engineering work relating to construction <br />of the Whitewater Park; and authorization and appropriation offunds by the Pueblo <br />City Council for the preparation and filing of this application. <br /> <br />C. Date water applied to beneficial use: Not applicable. <br /> <br />7. Amount claimed: Applicant requests conditional water rights in cubic feet per <br />second ("cfs") at each of the Project's structures as follows: ' <br /> <br />3 <br />