Laserfiche WebLink
<br />9121/98 - Final RSR <br /> <br />NATURAL ENVIRONMENT SURVEY <br /> <br />Survey Date: 8/26/87 <br /> <br />e <br /> <br />Survey Location: <br />Survey Summary: <br /> <br />Basis for ISF: <br /> <br />NE/4 S32 T13S R80W <br />300 ft eleetrofished. Sample included: 50 brook trout (I" - 10") and 5 cutthroat trout <br />(7" - 9"). <br />brook and cutthroat trout fIShery <br /> <br />FIELD SURVEY <br /> <br />Survey Date: 8/26/87 <br /> <br />Method Used: R2X <br />Measured Flow (cfs): 2.68 <br />Survey Location: NE/4 S32 T13S R80W <br />Notes: None. <br /> <br />Grassline Width (ft): 12.8 <br />PHOTOS: 3 <br /> <br />WATER AVAILABILITY <br /> <br />Method: <br /> <br />Remarks: <br /> <br /> 5 <br />Vi <br />LL <br />~ 4 <br />~ <br />0 <br />...J <br />LL 3 <br />>- <br />...J <br />J: <br />I- <br />Z 2 <br />0 <br />:; <br />z <br /><( <br />Ci 1 <br />w <br />:; <br /> <br /> <br />Itexas. wk41 <br /> <br />The Texas Creek #1 hydrograph was derived as per a % of Gage #09107500: Texas Creek at <br />Taylor Park, CO. <br />See attached hydrograph. As per the Division 4 Engineer, senior water rights do not present a <br />water availability problem within this reach of stream. <br /> <br />OCT NOV DEC <br />3.1 2.5 2.0 <br /> <br />MEDIAN MONTHLY FLOWS cfs <br />IAN FEB MAR APR MAY JUN <br />1.8 1.4 2.2 4.2 18. 29. <br /> <br />AUG SEP <br />6.5 4.7 <br /> <br />JUL <br />12. <br /> <br />Texas Creek #1 as a % of gage #09107500 <br />1929-92 <br /> <br /> <br /> <br /> <br />------------ <br /> <br />---------- <br /> <br />o <br /> <br />oeT NOV DEC JAN <br /> <br />FEB MAR APR MAY JUN <br />MONTH <br /> <br />JUL AUG SEP OCT. <br /> <br />_ CWCS ISF AMOUNT <br /> <br />C:\MARKINEW _RECSIDIV _ 4\19971wp\97 _A_Rcc_sum_rpl.doc <br />