My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00330
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00330
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:48:46 PM
Creation date
10/4/2006 6:35:51 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/27/1968
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Engineering Division, and Mr. Ike Redmond, <br />Chief of Planrtin~ Repo~ts Branch with whom <br />I think most of you are familiar. <br /> <br />I <br /> <br />We brought a viewgraph projector but I <br />am sure that all of the members of the Board <br />have, as part of the report, the revelant <br />charts and I think that most of the members <br />of the audience also have them so therefore <br />we will not interrupt or disrupt the meeting <br />to set up the viewgraph projector at this <br />time. If, however, during the lunch hour <br />any of the members of the audience would be <br />interested in looking at these we will be <br />pleased to set them up at that time. <br /> <br />I'd like to cover five items. First <br />of all, Trinidad. Secondly, our preconstruc- <br />tion planning on Las Animas. Thirdly, the <br />progress of our report on the plan of im- <br />provement on the Arkansas above John Martin <br />Dam. Fourth, the study of the Arkansas <br />between John Martin Dam and Great Bend, <br />Kansas. Fifth, flood plain management. <br /> <br />I <br /> <br />First of all, it is a source of great <br />gratification to us, and I am sure to all <br />of you here, that the long-delayed Trinidad <br />Project is about to get under way. We <br />advertised for bids on the 9th of February <br />and the bids will be opened on the 3rd of <br />April in Trinidad. We class this project <br />for the outlet works in the $1 to $5 million <br />range. The c~nstruction period ~ill be 670 <br />days. There has been a considerable degree <br />of interest shown on the part of both general <br />contractors and suppliers of equipment and <br />materials. Our other early actions which <br />are in progress include the design of relo- <br />cations. We have acquired all the lands <br />required for the outlet works and we are now <br />making appraisals of real estate for the <br />remainder of the project lands. The Presi- <br />dent's budget for fiscal year 1969 includes <br />$1.7 million for the continuation of con- <br />struction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.