My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00330
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00330
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:48:46 PM
Creation date
10/4/2006 6:35:51 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/27/1968
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />-'-'\.1-' <br /> <br />"Closed Basin Division. San Luis Valley pro;ect. Colorado <br /> <br />The report of the Secretary of the Interior on the Closed Basin <br />Division. San Luis Valley project. Colorado. is under considera- <br />tion in the Executive Department of the Government. A reanalysis <br />of the project is being made based on eliminating construction <br />west of State Highway No. 17. <br /> <br />San Juan-Chama pro;ect. Colorado-New Mexico <br /> <br />Progress on construction contracts is as follows: <br /> <br />Contract <br /> <br />Approximate percent complete <br /> <br />Azotea Tunnel and' appurtenant <br />structures <br />Blanco Tunnel. Diversion Dam. <br />and appurtenant structures <br />Oso Tunnel <br />Azotea Creek channelization <br />Heron Dam and relocation of <br />State Highway 95 <br /> <br />78.4% <br /> <br />80.2% <br />67.9"~ <br />54.7% <br /> <br />14.5% <br /> <br />Nava;o Indian Irriqation pro;ect. New Mexico <br /> <br />Contract <br /> <br />Approximate percent complete <br /> <br />Part of Main Canal and <br />Tunnel No. 2 <br />Gobernador. 8.9 and Largo <br />Siphons and 2.7 miles of <br />Main Canal <br /> <br />77% <br /> <br />34% <br /> <br />A contract for modification of the Navajo Dam outlet works and <br />spillway was awarded to Industrial Builders. Inc.. Fargo. North <br />Dakota. on August 18. 1967. for the amount of $608.523.25. Part <br />I of the contract is for installing the two 72-inch jet valves <br />and work associated with the stilling basin. Part II is for the <br />remainder of the work including installation of stainless steel <br />liner plates. As of February 29. 1968. Part I was 58 percent <br />complete. <br /> <br />Costilla proiect. Colorado-New Mexico <br /> <br />Copies of the reconnaissance report were furnished to the Board <br />on February 9. 1968. for review and comment." <br />
The URL can be used to link to this page
Your browser does not support the video tag.