Laserfiche WebLink
<br />...,I"" ""'v <br /> <br />MR. CRANDALL: <br /> <br />MR. GOODWIN: <br /> <br />MR. CRANDALL: <br /> <br />MR. GOODWIN: <br /> <br />MR. CRANDALL: <br /> <br />MR. GOODWIN: <br /> <br />MR. STAPLETON: <br /> <br />MR., KROEGER: <br /> <br />Every year that it is delayed it is costing <br />us a lot of money." <br /> <br />"Well, Crystal in particular is pretty <br />small, it's 28 megawatts. As far as the <br />powerplant at Crystal is concerned the dis- <br />advantage of not having it is that we can't <br />peak the Morrow Point powerplant."- <br /> <br />I <br /> <br />"That's the thing I was trying to get <br />you to say." <br /> <br />"This is just a pure engineering fact. <br />We have 120 megawatts installed at Morrow <br />Point and we can only operate about half <br />that without Crystal. We can't operate it <br />as a peaking plant because the downstream <br />fluctuations that would result cannot be <br />tolerated. " <br /> <br />"I know there is nothing that you people <br />can do but I am wondering if there is any- <br />thing the State of Colorado or this Board <br />could do that would help in any way? I hate <br />to see a project three-fourths done and then <br />stopped." <br /> <br />"This postponement, of course, is a <br />result of forces that are beyond the control <br />of reclamation. We are anxious to get'on <br />with this constructive work." <br /> <br />"Thank you." <br /> <br />"Any further questions of Mr. Crandall <br />from the Board?" <br /> <br />"I'd like to conunent and ask Dave a <br />question or two in regard to the operation <br />and management on the Navajo. Dave, you <br />report that the plan is to maintain a level <br />of about 5990 at Navajo, and at this level <br />there is practically no usable water area <br />for recreational purposes within the State <br />of Colorado. I was wondering what the <br />pressures are or what the needs are to not <br />let the water level go above that." <br /> <br />I <br />