My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00319
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00319
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:48:30 PM
Creation date
10/4/2006 6:35:36 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/27/1999
Description
CF Section - Non-Reimbursable Projects and Investigations - El Paso County Water Authority - Water Study
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br /> <br />721 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (303) 866.3441 <br />FAX: (3031 866-4474 <br /> <br />STATE OF COLORI\DO <br /> <br />- <br /> <br />.. . <br /> <br />,. <br />.) <br /> <br />Bill Owens <br />Governor <br /> <br />Greg E. Walcher <br />Executive Director, DNR <br /> <br />MEMORANDUM <br /> <br />Peter H. Evans <br />Acting Director, eWeB <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members <br /> <br />William P. Stanton, P.E. vJ(f. <br />Chief, Project Planning and Construction Section <br /> <br />FROM: <br /> <br />DATE: <br /> <br />January 19, 1999 <br /> <br />SUBJECT: . <br /> <br />Agenda Item 16c, January 27-28, 1999 Board Meeting - <br />Construction Fnnd - Non-ReiJIlbursable Projects and Investigations <br />El Paso County Water Authority - Water Study <br /> <br />. <br /> <br />Introduction <br /> <br />The El Paso County Water Authority hllS requested a $75,000 grant for the completion of <br />a Water Master Plan. Mr. Phillip J. Voegtle, P.E., the technical consultant to the Authority, will <br />be at the January meeting to make a presentation and answer questions. <br /> <br />Background <br /> <br />The El Paso County Water Authority collSists of sixteen water districts, municipalities, and <br />the county. The Authority is governed by a five member board. <br /> <br />In 1997, the Authority hired GMS, Inc. of Colorado Springs to conduct an inventory of <br />county water purveyors to determine the amount of water each owns and supplies, and their future <br />needs. This was to be an initial step towards the preparation of an El Paso County Water <br />Resources Study. <br /> <br />In 1998, the Authority adopted a five year program of technical studies aimed at the <br />development of a long range, county wide Water Master Plan. The purpose of the plan is "to <br />develop water resources, systems, and facilities in whole or in part for the benefit of Authority <br />e members and their inhabitants, and other residents of the county, now and into the future. " <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.