My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00289
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00289
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:48:17 PM
Creation date
10/4/2006 6:34:58 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/21/2002
Description
WSP Section - Colorado River Basin Issues - Colorado River Coordinated Long-Range Operating Criteria Five Year Review
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />North Platte River Basin Water Use, Growth & Water <br />Demand Projections <br /> <br />Department of Natural Resources-Colorado Water ConseNation Board <br /> <br />March 2002 <br /> <br />This is part of the CWCS's continuing cffort to help <br />communities determine whether their existing water <br />supplies are adequate. This latest effort began in 1999 <br />with a conservation survey of local governments. <br />publiclJlion and distribution of a dam site inventory. <br />and series of meetings in each major water basin. Tasks <br />yet to be completed include the publication of watcr <br />infonnutiol1 fact sheets. a drought planning assessment/ <br />carry-over storage assessment. and these preliminary <br />growth and water demand projection fact sheets. These <br />materiab and others are available at our websitc. <br /> <br />u <br /> <br />Basin Statistics - These numbers give a general overview of <br />the current (2000) and future (2030) statistics within the basin, <br />Year Population Ir.-igated Total Diversions Current Total <br /> (3) Acres (7) (R) Storage <br /> Ca(mdt,y (6) <br />2000 2.850 130,000 658,400 acre feet 33,662 acre feet <br />2030 4,500 130,000 658,700 acre feet 33,662 acre feet <br />Percent +58% 0% +0.04 % 0% <br />Change <br /> <br />,. <br /> <br />~ <br />1 <br /> <br />~ <br /> <br />North Platte River Basin Projected Future Water Demands !! 0.8) <br /> <br /> 700 <br /> 600 <br /> 500 <br />. <br />" <br />- <br />. <br />. <br />, 400 <br />0 <br />S <br />" <br />. <br />~ <br />t 300 <br />~ <br />e <br />u <br />., <br /> 200 <br /> 100 <br /> 0 <br /> <br /> Native Supply <br /> -lrrigationCU <br /> -MunicipalCU <br /> -TotalCU <br /> -Total Demands/Diversions <br /> -Exports <br />. . . . <br /> <br />2000 <br /> <br />2010 <br /> <br />2020 <br /> <br />2030 <br /> <br />Year <br /> <br />1- .. <br /> <br />- <br /> <br /> <br />Greg Walcher <br />DNR Executive Director <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />DrClft <br /> <br />lloooinPopUat....~eo....y (2f <br /> <br />~ <br /> <br />n Natiw Supply = <br />Undepleted. <br />unregulated available <br />surface water. Total <br />J)emands/l>i\'ersinns <br />= T ora] amount of <br />v..'ater removed from <br />the stream. some <br />water may return to <br />the stream if it is not <br />cOllsuplively used. <br />CU= Cnnsumpth"e <br />Use= amount of <br />water that is <br />consumed and lost to <br />lhe system while <br />applying water to a <br />beneficial use. <br /> <br />I <br />I <br />I <br />_-.J <br />
The URL can be used to link to this page
Your browser does not support the video tag.