Laserfiche WebLink
<br />p' <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />-2- <br /> <br />remaining 2004 meetings with the addition of May 27,2004 to <br />the May meeting in Alamosa, Colorado, Motion was approved <br />8-0. Ray Wright and Russell George were not present, <br /> <br />2. <br /> <br />Stream and Lake Protection - ISF Rulemaking, Rule 6g-Selection of Hearing Date, <br />Time and Place <br />Tape I, Track I 14:25 - 18:07 <br />Action: A motion was made by Greg Hoskin with a second by Keith Catlin to accept <br />staff recommendation to schedule this hearing for March 16,2004 at 4:00 <br />p,m, in Colorado Springs, Colorado, Felicity Hannay was appointed as <br />Hearing Officer and Dan McAuliffe was appointed as Alternate Hearing <br />Officer, Motion was approved 8-0. Ray Wright and Russell George were not <br />present. <br /> <br />3. <br /> <br />Review and Approval of Meeting Minutes <br />Tape I, Track I 18:07-18:45 <br />a, November 19-21,2003 <br />Action: This item was moved to the March 16-17, 2004 meeting in Colorado Springs, <br />Colorado, <br /> <br />4. <br /> <br />Approve and/or remove items from Consent Agenda Items <br />Tape I, Track I 18:45-19:48 <br />Action: A motion was made by Carolyn McIntosh with a second by Don Schwindt to <br />accept the Consent Agenda items as presented, Motion was approved 8-0, <br />Ray Wright and Russell George were not present. <br /> <br />5. Flood Protection Section - Colorado Floodplain and Stormwater Criteria Manual <br />Tape I, Track I 19:48-48:53 <br />Action: Information item, no formal action taken, <br />a, Instruction #7: Stormwater Runoff Detention <br />b, Instruction #8: Flood Conveyance within Irrigation Ditches/Canals <br />c, Instruction #9: Floodplain Development Practices <br /> <br />6. Flood Protection - South Platte Downstream Channel Improvement Project - Semper <br />Development Easement Request <br />Tape I, Track I 48:53-1:01:44 <br />Action: A motion was made by Harold Miskel with a second by Russell George to <br />accept staff recommendation to approve the construction easement and non- <br />exclusive easement request for the sidewalk project for Semper Development <br />Ltd, On the CWCB right-of-way under Method III fee considerations, <br />Authorize staff to prepare the necessary easement documents and the Director <br />to execute said documents, It should be further recommended that the grantee <br />should replace and reclaim all existing easement/project features, Motion was <br />approved 9-0, Ray Wright was not present. <br /> <br />7. <br /> <br />Legislative Review <br />Tape I, Track I 1:01:44-1:29:39 <br />Action: Information item. No formal action taken, <br />Flood Protection. Water Project Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />