My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00273
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00273
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:48:04 PM
Creation date
10/4/2006 6:34:45 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/20/2000
Description
CF Section - Special Purpose Accounts and CWCB Flood Emergency Response Fund
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />These program needs have evolved from a number experiences, requests, and findings, From the <br />experiences and requests ofrecent major flood events, including: <br /> <br />\ <br /> <br />. Big Thompson Canyon Flood on July 3 I-August I, 1976; <br />. Lawn Lake Flood of Estes Park on July 15,1982; <br />. Western Slope Floods on May 25 - June 6, 1984; <br />. Statewide floods on June 1- July 15, 1995; <br />. Fort Collins and Northeast Colorado Floods on July 28 -August I, 1997; and <br />. Colorado Springs and Southeast Colorado Floods on April 28 - May 2,1999. <br /> <br />. <br /> <br />The Board contracted the professional services of McLaughlin Water Engineers, Ltd, to conduct a <br />"Statewide River Rehabilitation & Floodplain Management Needs Inventory", One of the conclusions and <br />recommendations of the statewide assessment which received a forty percent response from the towns, <br />cities, counties and water and flood related organizations was to "create a flood emergency planning fund", <br /> <br />In response to these unmet needs in flood mitigation activities under a flood threat or response operation, the <br />staff presents the attached "Proposed Flood Emergency Response Program," dated October 2000. The <br />proposed program will operate in hannony with the Department of Local Affairs, Office of Emergency <br />Management and the Colorado Natural Hazard Mitigation Council (CNHMC), <br /> <br />The attached proposal addresses the unmet needs and outlines the program elements for a $150,000 annually <br />funded program, The funds for this program would come from the allocation of the five-percent for <br />floodplain projects as authorized in the CWCB Construction Fund. This program will be funded to the <br />$150,000 level on an annual recommendation. <br /> <br />. <br /> <br />Recommendation <br /> <br />Staff recommends that the Board request the General Assembly to authorize up to $150,000 from the <br />Construction Fund to be appropriated to the Department of Natural Resources for allocation to the CWCB <br />for the creation of a Flood Emergency Response Fund. <br /> <br />Attachment: Proposed Flood Emergency Response Program dated October 2000 <br /> <br />e <br /> <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.