My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00267
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00267
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:47:59 PM
Creation date
10/4/2006 6:34:38 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/24/2001
Description
Summary Minutes and Record of Decisions - September 24-25, 2001
Board Meetings - Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />8a. <br /> <br />Colorado River (Main stem) Basin Director's Report <br />Tape 2, Start/Stop: <br />Action: Information item; no action taken. <br /> <br />0600 - 0622 <br /> <br />8b. <br /> <br />Yampa-White River Basin Director's Report <br />Tape 2, Start/Stop: <br />Action: Information item; no action taken. <br /> <br />0622 - 0760 <br /> <br />8c. San Juan/San Miguel-Dolores River Basin Director's Report <br />Tape 1, Start/Stop: 6695 - 7160 <br />Tape 2, Start/Stop: 0001 - 0600 <br />Action: Information item; no action taken. A presentation was made by the La <br />Plata Water Conservancy District, and public comment on the proposed <br />Plateau Creek Reservoir was heard. <br /> <br />8d. <br /> <br />Gunnison River Basin Director's Report <br />Tape 2, Start/Stop: <br />Action: Information item; no action taken. <br /> <br />0760 - 0783 <br /> <br />8e. Discussion on Future Policy Regarding the Gallup-Navajo Project <br />Tape 2, Start/Stop: 0783 - 1450 <br />Action: Information item; no action taken. <br /> <br />8f. <br /> <br />Report on the Colorado River Delta Symposium in Mexicali <br />Tape 2, Start/Stop: <br />Action: Information item; no action taken. <br /> <br />1450-1820 <br /> <br />8g. Discussion on Future Policy Regarding the Yuma Desalter Plant <br />Tape 2, Start/Stop: 1820 - 2312 <br />Action: Information item; no action taken. <br /> <br />8h. Status of Upper Colorado River Endangered Fishes Recovery Goals - EDO Report <br />Tape 2, Start/Stop: 2312 - 3340 <br />Action: A motion was made by Eric Wilkinson that the Board support the Draft <br />Recovery Goals that have been developed for the Colorado River <br />Recovery Program in letter form, expressing in that letter of support some <br />reservations about the criteria listed for downlisting and delisting the <br />Colorado Pike Minnow. The motion was seconded by Greg Hoskin and <br />approved (8-0). <br /> <br />9a. Rio Grande Director's Report <br />Tape 3, Start/Stop: 2983 - 3032 <br />Action: Due to Member's absence, this report was not given, although Rod <br />Kuharich commented briefly on issues in this Basin. <br /> <br />lOa. Arkansas Director's Report <br /> <br />Minutes September 24-25, 2001 <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.