Laserfiche WebLink
<br />.:l!:lUl:! <br /> <br />year and next year and that by 1966 the inlet <br />works would be completed so that higher <br />storage could be obtained during the spring <br />runoff of 1966." <br /> <br />MR. KROEGER: <br /> <br />"It's not possible for some engineering <br />changes and some structure developed whereby <br />they could go ahead and fill?" <br /> <br />1 <br /> <br />I'IR. JENNINGS: <br /> <br />"Those are always possible, but I imagine <br />that it would be at a considerable expense to <br />do those things. I'm not familiar right here <br />with all of the details but I imagine it would <br />be a substantial increase in expenditure to <br />do that. <br /> <br />I just might add, while I am on my feet, <br />that in the operation of these reservoirs <br />that are constructed by the Bureau, an agree- <br />ment is reached, generally between three <br />parties, the Bureau of Reclamation, the oper- <br />ator of the reservoir, and the National Parks, <br />in which certain features are exempted from <br />those agreements, such as the dam and the area <br />immediately above and immediately below; that <br />the matters of the operation of the reservoirs <br />and those things are under the control of the <br />Bureau and ~ under the control of the agency <br />operating the recreation features. We do <br />work up an operating plan for these recrea- <br />tion features. We show, to the best of our <br />ability, what the operations will be and <br />those things. The legislation provides that <br />the areas must remain in the name of the <br />United States so, accordingly, the Bureau <br />does have to retain certain jurisdictions in <br />anyone of these operating agreements. <br /> <br />Now, we have agreements such as on Vega, <br />Smith Fork, and paonia Reservoirs where those <br />are operated by the State Park and Recreation, <br />the state agency but we do retain operation <br />controls. We do exempt from those agreements <br />the dam proper, the areas which we want to <br />control for the operation of the project, the <br />ones that we feel are necessary for safeties, <br /> <br />1 <br />