My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00261
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00261
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:47:58 PM
Creation date
10/4/2006 6:34:33 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/13/1964
Description
Table of Contents, Agenda, Minutes and Resolution
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />MRS. KEATING: <br /> <br />MR. STAPLETON: <br /> <br />MRS. KEATING: <br /> <br />..JOQ..L <br /> <br />"It isn't a resolution, Mr. Stapleton." <br /> <br />"Read the minutes then." <br /> <br />"This is from the official minutes of <br />the Board meeting of June 5, 1958: <br /> <br />'Mr. Nelson distributed copies of the <br />following which he read to the members: <br /> <br />COLORADO WATER CONSERVATION BOARD <br /> <br />Attached is a list of priorities for <br />study and planning potential participating <br />irrigation projects of the Colorado River <br />storage Project. <br /> <br />Adoption of this list would result in <br />altering a list approved for priorities in <br />1954. <br /> <br />Since that time, Woody Creek Project <br />was removed from the storage project list of <br />participating units to be giveh priority for <br />study by the Bureau of Reclamation under pro- <br />visions of the act authorizing the storage <br />project. <br /> <br />A study made by the Colorado River Water <br />Conservation District staff revealed Eagle <br />Divide, Ohio Creek, and Grand Mesa Projects <br />should have lower priorities. <br /> <br />This list should be the guide for alloca- <br />tion of money appropriated by the Colorado <br />General As~embly to speed study of projectS. <br />The priority would also help guide actions <br />through the authorization stages involvin~ <br />making definite plan reports. <br /> <br />Circumstances may require alteration of <br />the list. <br /> <br />Several factors were take~ into consider- <br />ation in making this list, including local <br />interest, economic importance, and benefit- <br />
The URL can be used to link to this page
Your browser does not support the video tag.