Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Agenda Item 20c. <br />July 14,1998 <br /> <br />page 3 <br /> <br />TABLE (2) ADDITIONAL PROSPECTS FOR 1998 <br />BORROWER PROJECT DESCRIPTION AMOUNT <br />Highline Canal Co. Rehabilitate the siphon at the Smith Hollow $250K <br />(Otero Co.) crossing <br />La Veta, Town of Enlargement of the Town Lakes. $1.3M total $975K <br />(Huerfano Co.) project cost. <br />Morrison, Town of Build a new 500 acre-foot reservoir at gravel pit $2M <br />(Jefferson Co.) site, including a 2 mile pipeline. <br />North Sterling Build a new 1000 acre-foot stabilization $500K <br />Irrigation Dist. reservoir. $750K total project cost. <br />(Logan Co.) <br />Pine River Canal Co. Construct a pipeline to replace the tunnel. $300K <br />(La Plata Co.) $300K total project cost. <br />Platte Valley Irrigation Construct a spillway on the Coal Ridge Waste $300K <br />(Weld Co.) Reservoir. <br />Uncompagre Valley Replace open ditch laterals with pipeline under $4.2M <br />Water User Assoc. the Salinity Control Program. CWCS loan based <br />(Montrose/Delta Cos.) on 30% of a $14 million initial project. <br />West Creek Lakes WD Rehabilitate the West Creek dam. $250K <br />(Jefferson Co.) <br />Total Additional Prospects for 1998........................ $13.3M <br /> <br />D:\wp51 \PROJ-NEW\20cJuly98 <br />