Laserfiche WebLink
<br />Agenda Item 20c. <br />July 14,1998 <br /> <br />page 2 <br /> <br />TABLE (1) APPLICATIONS RECEIVED IN 1998, TO DATE <br />BORROWER PROJECT DESCRIPTION AMOUNT <br />Groundwater Construct new 2,200 acre-foot reseryoir to $1.7M <br />Appropriators of the augment the South Platte River. $1.7 million <br />South Platte total project. (HB-1189) <br />(Sedgwick Co.) Approved 3/11/98. Included in HB 98-1189. <br />Leroux Creek Water Rehabilitate the Carl Smith Dam that failed May $300K <br />Users Association 2, 1998. $300K to $1 M total project cost. <br />(Delta Co.) <br />Emergency Loan Scheduled for consideration July 14, 1998 <br />Western Mutual Ditch Rehabilitate diversion structure on the South $100K <br />Co. Platte River. $217K total project. <br />(Weld Co.) Approyed 5/11/98. <br />Small Project Loan <br />Total Amount of Applications Received in 1998, to Date........ $2.47M <br /> <br />TABLE (2) ADDITIONAL PROSPECT~ FOR 1998 <br />BORROWER PROJECT DESCRIPTION AMOUNT . <br />Agricultural Ditch and Locklomond Reservoir rehabilitation, and $500K <br />Reseryoir Co. construct a new spillway for Main Reseryoir. <br />(Jefferson Co.) <br />Big Stick Ditch Co. Rehabilitate portions of the Big Stick Ditch, and $1.5M <br />(La Plata Co.) build a new 1000 acre-foot reservoir. <br />Boulder and Whiterock Rehabilitate the Panama Reservoir Dam. $300K <br />Ditch and Res. Co. <br />(Boulder Co.) <br />Colorado Trout Group Rehabilitate the dam on Lake Manchester. $100K <br />(Boulder Co.) <br />Dolores Water Construct new infrastructure to allow $2M <br />Conservancy District deyelopment and distribution of additional water (Initial request) <br />(Dolores and supplies. $11 M to $25M total project cost. <br />Montezuma Co.) <br />Goodhue Ditch and Rehabilitate portions of the ditch. $100K <br />Reservoir Co. <br />(Boulder Co.) <br /> <br />, <br /> <br />. <br /> <br />. <br />