My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00234
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00234
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:47:24 PM
Creation date
10/4/2006 6:33:47 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/23/2002
Description
CWCB Director's Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />representative of Colorado storm patterns. The PMP values are the key, basic elements for the Corps Dam <br />Safety Study. The non-federal PMP study fmdings will be significant information in the general public <br />acceptance of any proposed reservoir operations or dam modifications. <br /> <br />Site Specific Probable Maximum Precipitation Study for Cherry Creek <br />Reservoir-USACE/NWS results from 1995 study <br /> <br />Top the Dam <br />elevation 5644.5 <br /> <br />Top of US ACE PMF Pool <br /> <br />eIev.5647.5 <br /> <br /> <br />Elev. 5608.1 <br /> <br />Top of Conservation Pool <br />Elev. 5550 <br /> <br />Elev. 5504 <br /> <br />6. <br /> <br />Flood Response Fund <br />Authorization: SBOl-157 <br />Water Source: All Colorado streams <br />Location: Statewide <br /> <br />Grant Amount: $150,000 <br />Project Type: Quick Response to flooding <br />Project Manager: Larry Lang <br /> <br />The Flood Response Fund (Response Fund) provides the opportunity to fund flood preparedness <br />response and recovery activities following flood events and disasters. The flood response program has five <br />elements, which are Flood Forecasting and Preparation, Aerial Photography of Flooded Areas, Flood <br />Documentation and Identification of Specific Hazards, Evaluations and Revisions of Floodplain <br />Designations, and Development of Disaster and Recovery Mitigation Plans. <br /> <br />The Board has approved the staffs operational plans and guidelines for the administration of the <br />Response Fund. The program is administrated by the Board's Flood Protection Section and the program is in <br />full operatious. A number of the element functions are under contract to professional firms. <br /> <br />7. Mesa County - Boslev Wash Feasibilitv Studv and Demonstration Proiect <br />Authorization: HB 00-1419 Grant Amount: $75,000 <br />Water Source: N/A Project Type: Flood Control <br />Location: Mesa County - near Clifton Project Manager: Larry Lang <br /> <br />Page 5 of3l <br />
The URL can be used to link to this page
Your browser does not support the video tag.