My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00228
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00228
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:47:17 PM
Creation date
10/4/2006 6:33:44 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/23/2001
Description
CF Section - Changes to Existing Loans - Consolidated Mutual Water Company Fortune Reservoir Construction Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />e <br /> <br />30" Steel Outlet Works Installation: <br />Due to discrepancy between the original contract documents and the bid addendum, <br />additional work was required to complete the installation of the concrete mud matte located <br />beneath the full length of the 30" outlet pipe concrete encasement. <br /> <br />Additional Cost = $8,000. <br /> <br />Upstream Dam Face RiP Rap: <br />The pay item for Rip Rap was based on a per ton price, given an estimated specific gravity <br />of the rock to be imported. The actual rip rap imported to the site was heavier then <br />estimated, therefore increasing the overall tonnage quantity for the project. <br /> <br />Additional Cost = $300,000. <br /> <br />R.E. Monks Construction Company - Additional Cost due to Desilro Chanf!es: <br /> <br />Additional Reservoir Storage: <br />During excavation of the reservoir area it was determined that an additional 700 acre-feet of <br />storage could be obtained by modifying the grading plan. Placement of the excess material <br />was negotiated by Consolidated Mutual to occur on adjacent property, making the design <br />change economical or approximately $2,000 per acre-foot. <br /> <br />Additional Cost = $1,300,780 <br /> <br />. <br /> <br />Asbestos Pipe Removal: <br />Prior to construction an abandoned asbestos water line was discovered on the reservoir site, <br />which was removed in accordance with OSHA guidelines. <br /> <br />Additional Cost = $39,910 <br /> <br />The cost ovenuns to-date associated with R.E. Monks work is $1,980,690 for an revised <br />total contract amount of$16,670,81O. <br /> <br />Consolidated Mutual- Additional Costs due to Unforeseeu Site Conditions. <br /> <br />24"-30" Watermain Installation: <br />During construction of the 24".30" watermain from Fortune Reservoir to Fairmount <br />Reservoir, approximately 5-miles in length, a number of difficulties were encountered that <br />increased the overall cost of the installation. These problems areas included 11 complicated <br />ditch crossings, substantial unanticipated asphalt replacement in Indiana and McIntyre as <br />required by the State and County jurisdictions, time consuming and labor intensive traffic <br />control measures imposed by the State and County, and limited wolking hours from 8:30 <br />a.m. to 3:30 p.m. <br /> <br />Additional Cost = $1,500,000. <br /> <br />. <br /> <br />Consolidated Mutual - Additional costs due to materials purchased or chanf!es <br />reauired bv ref!nlatorv af!encies <br /> <br />30" Steel Outlet Works Pipe and Vault <br />Prior to the bid process, Consolidated Mutual determined it would be in their best interest to <br /> <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.