My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00226
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00226
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:47:16 PM
Creation date
10/4/2006 6:33:41 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
4/1/1970
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />time, have a new COst estimate but it will <br />undoubtedly be higher than that. The major <br />portion of this was federal cost. There was <br />some non-federal cost which is primarily, in <br />cases of this kind, in furnishing land ease- <br />ments, rights-of-way, for construction. <br /> <br />It could be constructed in segments. If <br />local conditions such as delays in getting <br />requirements of local cooperation in certain <br />areas cropped up it could be done in segments. <br /> <br />I <br /> <br />This design as presently envisioned, we <br />would now have to include the banks of the <br />Chatfield and Cherry Creek Dams as if they <br />were ip 'operation. Cherry creek is, Chatfield <br />soon will be. These would be considered,. <br />Originally only the Cherry Creek Dam was con- <br />sidered. <br /> <br />Going further, the project was reclassi- <br />fied from an inactive to a deferred for restudy <br />status on 15 July 1965, except as Mr. Sparks <br />mentioned for the improvement from Chatfield <br />Dam down to Denver proper and this was included <br />as part of the Chatfield Project. <br /> <br />We are now in the process of preparing a <br />preliminary examination, in other words, a <br />preliminary 'look-see' at the channel project <br />from Denver essentially down through the Nar- <br />rows Reservoir site at this time and this is <br />scheduled to be sent by us to the Missouri <br />Division in October of this year. It is <br />scheduled for completion at that time. Subse- <br />quent to that it will go to the Chief of <br />Engineers and, assuming that the scope of the <br />project is not altered to a great extent - and I'" <br />by scope I don't mean revised values but I <br />mean the actual physical layout of the project <br />as a channel improvement and levee system - <br />then the Chief of Engineers could recommend <br />the feasibility study of design scope or design <br />memorandum scope which is the basis for con- <br />struction. This then would permit construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.