My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00226
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00226
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:47:16 PM
Creation date
10/4/2006 6:33:41 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
4/1/1970
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />our project investigations program. The first <br />category is the Colorado State Water Plan and <br />our cooperation with it. The state has embarked <br />on a water plan study and we are assisting with <br />that. Meetings have been held with your staff <br />and the work has been mapped out and we are <br />getting under way with it. <br /> <br />We have going into its final phases the <br />comprehensive surveys. The chairman of the <br />joint state-federal group is Mr. Goslin of the <br />Upper Colorado River commission. That work is <br />proceeding into the stage of documenting the <br />results of the efforts up to date and it will <br />be a good starting point for additional broad <br />area planning. <br /> <br />In our feasibility studies we have first <br />the Basalt Project. There is a correction on <br />the report here under the 'a' item. Robie tells <br />me that at the Ashcroft site there has been a <br />substitute for it. It will be changed in the <br />specifics of that project plan. the new site <br />is called Castle Creek. Our report is scheduled <br />for completion a year from this coming December <br />on Basalt. This, of course, relates to the <br />yield at Ruedi Reservoir and some other complex <br />questions. <br /> <br />The next item is the Bluestone Project. <br />At the Mount ,J.oqan damsite we are proceeding. <br />We have a draft of the report and we expect to <br />have this pretty well done this fiscal year. <br /> <br />I <br /> <br />The next is the Grand Mesa. The feasibil- <br />ity report here which will cover service to <br />these lands you see is due at the end of this <br />fiscal year. <br /> <br />We are getting under way on our Lower <br />Yampa. This project is our name for what has <br />been called the 'Juniper' before. We have a <br />feasibility report scheduled some years off in <br />the future. <br />
The URL can be used to link to this page
Your browser does not support the video tag.