My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00226
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00226
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:47:16 PM
Creation date
10/4/2006 6:33:41 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
4/1/1970
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />V/VV <br /> <br />in that means we will be able to operate both of <br />the 60 megawatt units at Morrow Point. crystal <br />is in the current program and we hope we will be <br />able to issue specs and be ready to get going <br />on this long awaited next increment and final <br />increment of the Curecanti. <br /> <br />Silver-Jack - this is the stage of construc- <br />tion at Silver Jack Dam, Bostwick Park project. <br />We expect that will be finished by the end of <br />this coming up construction season and water <br />will be in storage there. It has been quite a <br />stretchout for budgetary reasons on the Bostwick <br />Park Project and work on the laterals and other <br />features will come along as our program con- <br />tinues. <br /> <br />This is Meeks Cabin Dam in Wyoming, a <br />similar type facility. It too will be completed <br />this coming summer but the second increment. of <br />the Lyman project, the China Meadows Dam, is <br />still as yet unfunded for construction. <br /> <br />To move on rapidly, this is starvation Dam, <br />the first impoundment of the large Central Utah <br />Project, now finished and water is bei~g im- <br />pounded in it. <br /> <br />The water tunnel which is the first segment <br />of the diversion of water through the Divide <br />out of the Colorado Basin into the Bonneville <br />Basin in utah was holed through not long ago. <br />This shows you the face of the hole just break- <br />ing through. <br /> <br />We expect to begin this coming fiscal year <br />with the start of construction on Soldier Creek <br />Dam which is the enlargement of the old Straw- <br />berry Reservoir. Some of you are familiar with <br />that area. <br /> <br />We have fish and wildlife mitigation <br />reservoirs at Bottle Hollow near Fort Duchesne. <br />These are really dikes rather than dams to <br />provide recreational impoundment which is in <br /> <br />I <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.