My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00213
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00213
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:47:06 PM
Creation date
10/4/2006 6:33:28 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/13/1998
Description
Native Aquatic Species Facility - Status Report on CWCB/CDOW Feasibility Study and MOU
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SCOPE OF WORK AND FEE ESTIMATE FOR NATIVE AQUATIC SPECIES <br />RESTORATION FACILITY <br /> <br />. <br /> <br />This scope of work has been prepared for the development of plans and specifications <br />for the first phase of the Native Aquatic Species Restoration Facility proposed for <br />construction on the Chiles Property Site. The initial planning for this facility was <br />presented in the Concept Design Report (COR) prepared by FishPro, Inc. (FishPro), <br />submitted to the Colorado Division of Wildlife (CDOW) in November 1996. The COR <br />showed the project proceeding in two phases with the first phase being a small start up <br />phase (Phase I) establishing basic facility functions and a second, larger, phase <br />(Phase II) significantly expanding the capacity of the facility as well as providing <br />provisions for visitation by the general public. <br /> <br />This scope was developed from a Scope of Work Outline previously submitted to <br />CDOW and is organized along the lines of FishPro's proposal to CDOW submitted <br />December 10, 1998. <br /> <br />In the "Approach" portion of the proposal for this project, FishPro proposed the design <br />aspects be broken into 7 discrete tasks. In subsequent discussions with CDOW there <br />are indications that a concept different than that presented in the COR is being <br />considered for the facility. Based on this some effort will need to be directed towards <br />the development of new concepts for the facility prior to moving into a design phase. In <br />these same discussions it was indicated that planning for future expansion should be . <br />performed to allow systems being constructed under the first phase of the project to <br />support an expanded facility. This too will require some effort as new concepts will <br />need to be incorporated into the planning for the Phase II facility. <br /> <br />At the request of CDOW we have prepared the following- scope and associated fee <br />estimates based on the tasks presented in our proposed approach. We have <br />attempted to arrive at a fee for each task that representats the higher end of a fee <br />range that might be anticipated for the accomplishment of the work. We are of the <br />understanding that fees for each task will be negotiated as the project progresses as <br />the completion of each task will serve to define the requirements of the next task. <br /> <br />The scope of the work associated with each task is as follows. <br /> <br />1) ProQram Verification <br /> <br />This task will be conducted in two parts. The first part will be a two day meeting in <br />Denver at CDOW's office. Preparation for this meeting will include the development of <br />a list of questions to be discussed with CDOW. After the meeting we will follow up on <br />questions or discussions that require further investigation and present responses to <br />these and the results of the meeting in a Program Verification Report. Meeting Minutes <br />will also be prepared by FishPro to document decisions made in the meeting. This ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.