My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00188
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00188
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:46:44 PM
Creation date
10/4/2006 6:32:56 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/14/1962
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />of the Curecanti Unit. That is in the Com- <br />missioner's office waiting for Secretarial <br />approval. <br /> <br />I <br /> <br />Now going to General Investigations, <br />under Reconnaissance Investigations, drafts <br />of our reconnaissance reports on Ruedi-western <br />Slope, Juniper Project, and a status report <br />on the Parshall project have been completed <br />and are in the final stages of publication. <br />On the Upper Gunnison Basin Reconnaissance <br />Report work is moving along. We have recently <br />had some meetings with those people to go <br />over their plans on that report and we intend <br />to get that draft out before the end of this <br />fiscal year. <br /> <br />Under Feasibility Investigations, the <br />report on the Animas-La plata Project was <br />approved by the Secretary in October and has <br />been transmitted to the federal agencies for <br />formal review under the Flood Control Act. <br /> <br />On the Dolores Project the field level <br />review on this project on the proposed feasi- <br />bility report has been completed and it is in <br />the state now of being revised and will then <br />be forwarded to the Secretary's office for <br />transmittal, under the Flood Control Act, to <br />various state and federal agencies. <br /> <br />As for the San Miguel Project, things <br />generally are progressing on schedule. The <br />work under way at the present time is drilling <br />of a number of damsites for that project. <br /> <br />I <br /> <br />On the West Divide Project, the final <br />feasibility designs are being now prepared <br />on selected project features and work is now <br />on schedule on that project. <br /> <br />The principal activity now on the Dallas <br />Creek Project is that we are looking at a few <br />features possibly to increase the planned <br />storage on this project. We have found more <br />lands in that Dallas Creek area than we <br />originally thought were there. <br />
The URL can be used to link to this page
Your browser does not support the video tag.