Laserfiche WebLink
<br />9121/98 - Final RSR <br /> <br />NATURAL ENVIRONMENT SURVEY <br /> <br />Survey Date: 6130/86 <br /> <br />Survey Location: <br />Survey Summary: <br />3 Basis for ISF: <br /> <br />FIELD SURVEY <br /> <br />0.8 miles oJs of Highway 50. <br />300' electrofisbed. Sample included: 53 brown trout (3"-13"), 1 white sucker. <br />brown trout fishery. <br /> <br />Survey Date: 10/8/93 <br /> <br />Method Used: RlX <br />Measured Flow (cfs): 11.71 <br />Survey Location: NW SE S18 T19S R73W 6PM <br />Notes: 0.8 miles oJs of Highway 50. <br /> <br />Grassline Width (ft): 14.8 <br />PHOTOS: 3 <br /> <br />WATER AVAILABILITY <br /> <br />Method: The Texas Creek hydrograph was derivelffrom stream flow data from the Texas Creek stream <br />gage near the confluence with the Arkansas River, See hydrograph below, As per the Division 2 Engineer, <br />senior water rights do not present a water availability problem within this reach of stream, <br /> <br />;:20 <br />" <br />~ <br /> <br />~ <br />~ 15 <br />110 <br /> <br />::: <br />~ 5 <br /> <br />e <br /> <br />OCT NOV DEC <br />13. 20. 16. <br /> <br />MEAN MONTHLY FLOWS (cfs) <br />IAN FEB MAR APR MAY]UN <br />15. 16. 21. 16. 6.5 15. <br /> <br />AUG SEP <br />13. 18. <br /> <br />JUL <br />22. <br /> <br />Texas Creek nr confl. Arkansas River <br />1971-76 <br /> <br />25 <br /> <br />, <br /> <br /> <br />-- <br /> <br />. ----~--- <br />---- <br /> <br />o <br /> <br />JUL AUG SEP <br /> <br />ocr <br /> <br />ocr NOV DEC <br /> <br />JAN <br /> <br />FEB MAR APR MAY JUN <br />Month <br /> <br />1_ INSTREAM FWW AMOUNT I <br /> <br />Div 2 Rec Sum Rpt <br />