My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00161
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00161
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:46:04 PM
Creation date
10/4/2006 6:32:42 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/23/2005
Description
Flood Section - South Platte Easement - Fee Structure
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />., <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />The cost of said appraisals/surveys would be borne by the applicant. <br /> <br />Maximum term of easement is twenty-five (25) years, <br /> <br />The easement value is computed as follows: <br /> <br />Step 1 - Determine the market value of the property in square feet or acres, <br />Step 2 - Determine size (area) of impacted CWCB Right-Of-Way, <br />Step 3 - Select an easement class factor from the Land Use Compensation Schedule (attached <br />as a part of Exhibit B*) which considers the development potential of the site, <br /> <br />Value Formula- Value = (Market value rate/area) X (area in sq, ft, or acres) X (easement <br />class factor), <br /> <br />Value = Dollar value for one-time lump sum payment. The easement is renewable in (25) years <br />and the consideration for renewal will be the computed amount adjusted for inflation, <br /> <br />Method II - Drainal!e Value Method (1996 METHOD) <br /> <br />-. <br /> <br />This method shall use an annually established standard rate that will be used equally for all <br />applications not considering the particular location of the easement. The method is applicable <br />when a floodwater discharge is passing over or through an existing or newly constructed project <br />feature or facility (weir, culvert or pipe, inlet box, spillway or other structural design feature), <br />No charge will be assessed for the passage of floodwaters over natural conveyance paths or <br />man-made earthen channels, <br /> <br />Maximum term of easement is twenty-five (25) years, <br /> <br />The Value is computed as follows: <br /> <br />Step 1- Use the UD&FCD easement fee rate, This is $I.QO sq, ft, for 1995-96, <br />Step 2 - Determine size of impacted CWCB Right-Of-Way, , <br /> <br />Value Formula - Value = (Standard rate @$1.00 sq,ft,) X (area in sq,ft,or acres), <br /> <br />Value = Dollar value is for a one-time lump sum payment. The easement is renewable in 25 <br />years and the consideration for renewal will be the computed amount adjusted for inflation, <br /> <br />Note: When either Method I or Method II is computed and determined to be less than $250, <br />a minimum charge of$250 will be assessed. <br /> <br />Note: Method I refer to Exhibit B. * Exhibit B, Contracts and Procurement Code Manual, <br />Office of the Attornev General. June 9, 1988, is on file at the CWCB offices. <br /> <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.