Laserfiche WebLink
<br />":" ':- <br /> <br />3. Contra'ct negotiations will then be initiated with the <br /> <br /> <br />highest ranked firm pursuant to section 24-30-1404, CRS <br /> <br /> <br />1973, as amended. <br /> <br />In evaluating firms, the following factors will be taken <br /> <br /> <br />into consideration by the CWCB staff, each of which will be <br /> <br /> <br />graded from one (lowest) to ten (highest) and weighted as <br /> <br /> <br />follows: <br /> <br />151 Design of and approach to the study (as embodied in <br />the PTS and amplified in the discussion with each <br />firm). <br /> <br />201 Capability to design and estimate the costs of earth <br />dams and foundations and of concrete spillways. <br /> <br />201 Capabil ity to design, evaluate the potent ial for, and <br /> <br /> <br />estimate the costs of and revenues from hydroelectric <br /> <br /> <br />faclll ties. <br /> <br />201 Capabil ity to perform hydrologic and inflow design <br /> <br /> <br />flood investigations, including reservoir operations <br /> <br /> <br />studies and water rights evaluations under Colorado <br /> <br /> <br />law. <br /> <br />51 Quality and clarity of PTS (writing, organization, <br />etc. ) . ' <br /> <br />-9- <br />