Laserfiche WebLink
<br />... shall conduct discussions with no less than three <br />persons regarding their qualifications, approaches to the <br />project, abilities to provide the required professional <br />services, anticipated design concepts, and use of required <br /> <br />professional services. <br /> <br />After holding such discussions, the firms involved are to be <br /> <br />ranked in order of preference: <br /> <br />... considering, and based upon, such factors as the ability <br />of professional personnel, past performance, willingness to <br /> <br />meet time and budget requirements, location, current and <br /> <br /> <br />projected work loads.... In selection, ... Colorado firms <br /> <br /> <br />shall be given preference when qualifications appear to be <br /> <br /> <br />equal. <br /> <br />In order to hold the required discussions and to evaluate <br /> <br /> <br />and rank the firms, the CWCB staff shall proceed as follows: <br /> <br />1. Upon receipt of the PTSs, a meeting will be scheduled <br /> <br /> <br />with each firm at which the firm's PTS will be discussed <br /> <br /> <br />at length. <br /> <br />2. Following these discussions, the CWCB staff will <br /> <br /> <br />evaluate and rank the firms based upon the information <br /> <br /> <br />pr6vided in the PTSs, the discussions with each firm, <br /> <br /> <br />and the comments of the references provided by each <br /> <br /> <br />firm. <br /> <br />-8- <br />