Laserfiche WebLink
<br />I\VT 1 ~~ LllV ~.~~ 1m ruv~~~~ ~Lt~lU~_.;~.\U <br /> <br />1'.-,.'. .t'J. .'IJ.) -:::,jO ':JUJ <br /> <br /> <br />1. <br /> <br />~ . jo <br />:.,. <br /> <br />. November 4, 1999 <br /> <br />Mr. Lan-y Lang <br />Colorado Water Conservation Board <br />823 Centennial Building <br />Denver, CO 80203 <br /> <br />Muller EngineerIng Company,lne. <br />Con$ulting Engineers <br /> <br />Re: <br /> <br />Easement @ Waste Management Site <br />MEC Project No. 9929.01 <br /> <br />IronGate 4. Su~e 100 <br />m Soulh Wad,wol1/l 8ou"vard <br />Lak,wood, Color,do 80221>4331 <br />TEL (303) 988.4939 <br />FAX 1303) 988.4989 <br /> <br />Dear Mr. Lang: <br /> <br />Thank you for taking the time to discuss the appropriate procedures to follow for us to acquire an <br />easement for constructing an improved outfall pipe to the South Platte River. Our site is the Waste <br />Management Transfer Station located along the west bank of the river located to the south of the <br />Union Avenue crossing within the City of Englewood. It is our intention to increase the outfall pipe <br />size from the existing 12-inch pipe to approximately a 42-inch pipe. A sketch of the easement <br />location is enclosed for your review. <br /> <br />One option that we would like to keep open is to leave the 12-inch in place and conSLrUct the <br />improved outfall adjacent to the existing pipe. Can you tell me if that is a viable option for us to <br />continue to consider? <br /> <br />. <br /> <br />On behalf of Waste Management of Colorado. we are hereby requesting CWCB to grant us an <br />easement for the storm sewer upgrade upon submitting the required supponing documentation and <br />paying the appropriate fees. It is our understanding that a drainage report and a lega] exhibit of the <br />easement are submittal documents. and a fee payment of $] per square foot of easement are required <br />before CWCD grants the easemcnt Wc cstimate the ensement size to be approximately] 200 square <br />feel using a 10 foot easement width. Please proceed ....ith bringing this requeSt to your Board to get <br />the process staned. <br /> <br />In the meantime. we will continue working toward completing the drainage report and preparing the <br />easement exhibit. Please let me know if there are any format requirementS for the easemcnt exhibit. or <br />if there is any other requirements that CWCB may have with our outfall design. We are currently in <br />the preliminary design phase for this outfall. and would like to be infomled about any other design <br />requirements. I haye talked with Ben Urbonas. who is with the UDFCD. and he told me about not <br />using granular bnckfill and ha'ing compaction requirements being 98'70 of Standard Proctor. <br /> <br />Please let me know if you need an)'thing else at this time. otherwise we will be in touch in the near <br />future. Thank you for )'our assistance regarding th is matter, <br /> <br />Sincerely. <br /> <br />MULLER ENGINEERING COMPANY. INC. <br /> <br />~d ~~t1 <br /> <br />. <br /> <br />Bruce A. Behrer Jr.. P.E. <br />Project Engineer <br /> <br />Cc: Tom Schweitzerl Waste Management: Colo. Landfill Division <br />