Laserfiche WebLink
<br />": <br /> <br />, <br />. - <br /> <br />3) <br /> <br />INSURANCE COVERAGE - The CWCB shall be named as an additional insured, and <br />shall have coverage in the amounts established by the Colorado Governmental Immunity <br />Act - part one of article 10 of title 24, lOa C.R.S., as amended. <br /> <br />. <br /> <br />4) FEE CONSIDERATIONS - A recommendation will be discussed at the meeting. This is <br />a standard fee consideration for a drainage system, which is one dollar per square foot. <br />Staff will recommend a fee consideration, which is two times the minimum. <br /> <br />5) RECLAMATION OF THE SITE - The Grantee will be required to prepare a reclamation <br />plan and provide the plan to the CWCB for approval prior to the termination of the <br />easement agreement for the restoration of the vegetation cover on the left overbank areas <br />if applicable at the termination of this easement agreement. <br /> <br />6) NON-EXCLUSIVE EASEMENT CLAUSE - The easement agreement will contain <br />language reserving the CWCB's right to grant additional easements on the same land <br />covered by this easement. <br /> <br />REQUESTED EASEMENT <br /> <br />Action Requested: <br />For the Waste Management of Colorado proposal, an easement is requested for construction and <br />maintenance of a 24-inch stormwater drainage system within the CWCB project right-of way <br />(ROW). The staff recommends that the minimum width be granted for construction and . <br />maintenance. This width will be determined upon the submittal of the final construction plans <br />from the applicant. <br /> <br />RECOMMENDATION <br /> <br />Following a review by the AG's Office and CWCB staff for Consent Agenda Item 3a, a <br />recommendation is as follows: <br /> <br />Approve the easement request from Waste Management of Colorado for construction and <br />maintenance of a 24-inch diameter stormwater drainage system into the right overbank of <br />the South Platte River. Authorize staff to prepare the necessary easement documents and <br />the Director to execute said documents. It should be further recommended that the <br />grantee shall not place any new markers or signs within the easement without written <br />approval of the CWCB staff. The fee consideration for the easement is the standard fee <br />for a drainage project. <br /> <br />L:/boardmem/Nov99/consentJa.doc <br /> <br />. <br /> <br />2 <br />