Laserfiche WebLink
<br /> 348 <br />'I. <br />" <br /> ('00) Wildlife 'lOd Northern Colorado Water $173,674 GOCO; $36,886 other DOW. <br />. Conservation District is completed. Ten <br /> well. ha vo been completed and are <br /> $225,000 operational. and five acres of ponds and <br /> ('01) associatOO small fish habitat has been <br /> completed. A 1/3 mile stream has been <br /> COnSlJ'UCloo J'br use as a brassy minnow and <br /> :1:illi!t stlckcrmouth minnow research nnd <br /> 375,000 propagation site. A total 01'2,600 acre teet of <br /> water was pumped in 2000 for shallow <br /> water welhlOds. and groundwater recharge, <br /> Peoled Tasks/Deliverables and Associated Costs for FY 01-02 Recommendation: <br /> Ongoing pumping costs ($80,000) for 10 wells to produce 9,OOOac-feet of water. Replacement of <br /> heavy equipment used to maintain project features ($40,000). <br /> Costs for all tasks related to this project shall not exceed $ 120,000 from the Native Species <br /> Conservation Trust Fund. <br /> Native Cutthroat Trout - The purpose of this project is to enhance Colorado River <br /> cutthroat trout (CReT) populations in accordance with the Colorado-Wyoming-Utah <br /> Conservation Agreement and Strategy (for Colorado River cutthroat trout), and preclude the <br /> need for federal protection through listing as threatened or endangered of any nati ve <br /> cutthroat trout in Colorado, and to ensure the timely recovery and de-listing of native <br />. greenback cutthroat trout. <br />Summary <br /> Prior Progress Highlights FY 01.02 FY 01.02 Contributions from other sources <br /> Allocations. Proposal. and operating support (leverage) <br /> $79,000 The cutthronltrout brood lake design at None <br /> ('00) Dolores has been completed. This project <br /> entails conversion of 5 small impoundmetlts <br /> (old tish rearing unit) to 3 larger. deeper <br /> $300.000 impounds, 2 spawning channels, and <br /> ('01) associatc<J water control structures. <br /> The ultra violet trealment system to protect <br /> IllJl1I: native cutthroat trout production at Bellvue <br /> has boon awardOO at a cost Of$274,ooo. A <br /> $379.000 structure to house the equipment wlll be <br /> built and is expectOO to use the remaining <br /> funds. <br /> Proiect TaskslDeliverables and Associated Costs for FY 01-02 Reconunendation: <br /> Construction of the Colorado River native cutthroat brood fish lakes, resulting in the production <br /> of about 500,000 eggs per year, is estimated to cost $348,000. $79,000 of NSCTF funds <br /> originally dedicated to design has not yet been awarded. Completed constructuion would be <br /> scheduled for fan of 2002/ <br />. Arkansas River Native Species - The purpose of this project is to protect, identify high <br /> quality habitats for Arkansas Darter recovery requirements to enable de-listing of this <br />