Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />721 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone, 1303J 866.3441 <br />FAX, 1303J 666.4474 <br /> <br />STATE OF COLORADO <br /> <br />~ <br /> <br />Roy Romer <br />Governor <br /> <br />MEMORANDUM <br /> <br />James S. Lochhead <br />Executive Director, ONR <br />OariesC. Lile,P.E. <br />Director, eWeB <br />Peter H. Evans <br />Ac..1ing Director, aVes <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members <br /> <br />FROM: <br /> <br />Larry Lang <br /> <br />DATE: <br /> <br />May 1,1998 <br /> <br />SUBJECT: <br /> <br />Agenda Items 5,b. May 11-12,1998 Board Meeting-- <br />South Platte River Channel Project, Right-of-Way Action <br /> <br />INTRODUCTION <br /> <br />At the November 6-7, 1995, Board Meeting, approval was given to grant requests for easements <br />in CWCB's right-of-way along the Chatfield Downstream Channel Improvement Project on a <br />case-by-case basis, The Board has received a request from the South Metro Fire Training <br />Academy (Academy) - Request letter attached. This request will cover a portion of the easement <br />that was granted to the Ron Koch Landscaping Company for the authorization to construct a 6- <br />inch water supply line at the January 20, 1998 Board meeting, This request by the Academy is <br />for an existing use by the Academy. An Academy structure is presently residing on the CWCB <br />right-of-way. This structure is a 40' x 8' storage shed with its accompanying service area. The <br />area of usage is approximately a 60 feet x 10 feet. <br /> <br />DISCUSSION <br /> <br />Item S.b. <br /> <br />The Board granted a non-exclusive easement to the Koch Company for the installation of a water <br />service and sewer line at its January 20,1998 meeting. During the preparation of the contract <br />including an easement survey, it was discovered that the Academy has a storage shed on the <br />Board lands, Following a field inspection by staff, it was determined that this easement can be <br />granted in harmony with the Koch Company easement. The Academy has agreed to remove the <br />shed to assist with the Koch construction schedule, However, due to the limited space/area of <br />the Academy's training facility, they desire to place the structure back on Board lands after the <br />pipelines are constructed. <br /> <br />1 <br />