Laserfiche WebLink
<br />, <br /> <br />) <br /> <br />) <br /> <br />, ' <br /> <br />I ., <br /> <br />Terror Creek Reservoir in Section 28. T12S R91W, 6PM; <br /> <br />then south about 27 miles to Cathedral Peak in Section <br /> <br />23. T50N R6W, NMPM; then east about 6 miles to Crystal <br /> <br />Creek Campground in Section 15. T50N R5W. NMPM; then <br /> <br />north-northeast about 35 miles to McClure Reservoir in <br /> <br />Section 13. TIIS R89W. 6PM; then northwest about 14 <br /> <br />miles to a point 5 miles north of Jones Peak in Section <br /> <br />28. T9S. R90W. 6PM; then southwest about 15 miles to <br /> <br />Chalk Mountain in Section 10. TIIS. R92W. 6PM; then <br /> <br />west-southwest about 29 miles back to Rapid Creek <br /> <br />Reservoir #1. The proposed target area includes <br /> <br />portions of Delta, Mesa and Gunnison Counties. Figure <br /> <br />1 is a sketch map of the target area. The proposed <br /> <br />target area includes portions of Delta. Mesa and <br /> <br />Gunnison Counties. Figure 1 is a sketch map of the <br /> <br />target area. <br /> <br />10. The project is intended to augment natural <br />precipitation within the target area to provide <br /> <br />improved snowpacks and additional water supplies for <br /> <br />storage and beneficial use. <br /> <br />11. The project will utilize not more than 15 ground based <br /> <br />generators. Seeding will be done with silver iodide. <br /> <br />-6- <br />