Laserfiche WebLink
<br />(8) There may be more icy road conditions and avalanches which make <br />travel more hazardous. <br /> <br />(9) It is believed to be immoral for mankind to artifica11y augment <br />snowfall or snowpack. <br /> <br />(10) Increased precipitation may result in increased fuel bills <br />and taxes. <br /> <br />(11) There should be no weather modifications until all other experi- <br />mental projects have been fully eval uated or until outcomes of a project are <br />capable of total prediction and control, <br /> <br />21. Twenty-one letters opposing the issuance of the Permit expressed some <br />of the concerns set forth in paragraph 20. Fifteen of these letters came from <br />persons living in the Ouray, Ridgway and Si1verton areas. One letter favored <br />issuance of the Permit. <br /> <br />22. In anticipation of the concern expressed by persons in the Ouray, <br />Ridgway and Silverton communities about the affect of any weather modification <br />on that general area, which is in a downwind area and could be affected; the, <br />program has been designed specifically to eliminate, as much as is possible, <br />those storm situations which to date have indicated a, contribution to a down- <br />wind effect. The frequency of such events is extremely small; the' estimate <br />of such events in a year is between 0 and 4. Even if there were a slight <br />carry-over effect, these towns are a sufficient distance from the intended <br />Project Area, that they should not be affected significantly by the program. <br />The conditions found in the Colorado River Basin Pilot Project to produce <br />downwind' effects have been eliminated from the instant program. <br /> <br />23. The expected duration of the weather modification operation for which <br />the Permit is sought was to run from December 1, 1975 through April 30, 1976" <br />, 'It is unlikely that a Permit can be issued before sometime in January, 1976. <br />Consequently, the mining and lumbering industries are not likely to be adversely <br />.- affected to any appreciable degree beyond that experienced by natural winter <br />snowfall. <br /> <br />24. The anticipated changes in the precipitation amounts in the Project <br />Area would fall wHhin 'the natural annual variation of precipitation, except <br />possibly during a very heavy winter snow season when seeding operations would <br />be suspended. The natural stream systems are expected to adequately handle <br />any n~tura1 and augmented precipitation resulting from the Project. <br /> <br />25. The other concerns expressed by opponents to the issuance of the <br />Permlt are substantially speculative in nature and would be alleviated if <br />the committee of citizens and operating'conslderations 'referenced in parae <br />graphs ,16 and 17, supra, were made a condition of issuance of the Permit. <br /> <br />26. The increase of only 3 to 5 percent of seasonal, accumulation of <br />precipitable water should not create a substantial hazard or harm above <br />natural conditions and the Project does not involve a high degree of risk <br />of substantial harm to land, people, health, safety, property or the <br />environment. Further, the Project is designed to include adequate safeguards <br />to prevent substantial damage to land, water rights, people, health, safety <br />or th~ environment, It shou'id be emphasized that the Project, when compared , <br />to the Colorado River Basin Pilot Project, will increase seasonal accumulation <br />of precipitable water 3 to 5 percent rather than 15 to 20 percent; will be <br />suspended when the average snowpack across the Project Area is 125 percent <br />of normal rather than 150 percent, as used as the limit under the Colorado <br />River Basin Pilot Project; ,and will be monitored and controlled in part'by <br />the committee of citizens, if the recommendations of the Hearing Officer <br />are accepted by the Director of the Department of Natural Resources. <br /> <br />27. The record discloses that the Project will not adversely affect <br />"another project. \ . <br /> <br />28. The Project is designed to minimize risk and maximize economic <br />benefits to the residents of the ,area. <br /> <br />-5- <br />