Laserfiche WebLink
<br />WEATHER MODIFICATION PERMIT <br /> <br />WY 84-2 <br />Page 5 <br /> <br />b. A summary of form WH3 indicating on which days and from which <br />generators seeding occurred in the project area and the <br />intended results bi-weekly: <br /> <br />1) to the Department of Natural Resources, <br />2) to newspapers in the project area (including the <br />Silverton Standard and the Alamosa Courier). <br />3) to the Colorado State Patrol and the Colorado <br />Avalanche Information Center. <br /> <br />c. A copy of the daily Worksheet Decision Summary Notification <br />Form on which seed/no seed decisions are based and the form <br />indicating the parameter data information requested and <br />utilized in making avalanche suspension decisions: <br /> <br />to the Department of Natural Resources. <br /> <br />d. As specified in C.R.S. 6 36-20-117(3) a written final <br />operational report and a written final report, evaluating the <br />project, or an annual operational report and an annual project <br />evaluation, as the case may be. A final operational report <br />along with a preliminary scientific evaluation of the project <br />shall be filed no later than thirty days after the completion <br />of the project. A final complete scientific evaluation of the <br />project shall be filed no later than one hundred eighty days <br />after the completion of the project. An annual summary report <br />shall be filed sixty days prior to the renewal of a permit <br />under the provisions of C.R.S. ~ 36-20-114(2). All such <br />reports are public records subject to the provisions and <br />limitations of part 2 of article 72 of title 24. C.R.S.: <br /> <br />to the Executive Director of the Department of Natural <br />Resources <br /> <br />11. To comply with the minimum guidelines for coordination of this <br />project with other State weather modification projects the Applicant <br />shall: <br /> <br />a. notify the designated representative of the Department of <br />Natural Resources each day seeding occurs of the location, <br />time, and rate of proposed seeding. <br /> <br />b. notify any other operator authorized to modify the weather in <br />the State during the designated time period before and after <br />cloud seeding operations. <br />