My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WMOD00206
CWCB
>
Weather Modification
>
Backfile
>
WMOD00206
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:28:38 PM
Creation date
10/1/2006 2:16:01 PM
Metadata
Fields
Template:
Weather Modification
Applicant
North American Weather Consultants
Project Name
Grand Mesa
Date
11/1/1985
Weather Modification - Doc Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />the period from the effective date of the contract through August 31, <br />1985. These reports shall disclose all such work and all data and <br />information obtained and results achieved in performance of the <br />contract. <br /> <br />Reports shall be submitted in accordance with the following format: <br />(Name of Organization) <br /> <br />Report Tit 1 e <br /> <br />Date <br /> <br />Pe ri ad <br /> <br />to <br /> <br />Division of Atmospheric Resources Research <br />Bureau of Reclamation <br />U.S. Department of the Interior <br />Cant ract No. <br /> <br />Dated <br /> <br />The report with the title page shall be bound with a cover sheet made of <br />cover stock. A letter of transmittal shall be made a part of the title <br />page. <br /> <br />F-2.5 FINAL <br /> <br />Fi ve copi es of a draft fi na 1 report shall be provi ded on or before <br />July 31, 1987. The Bureau will provide its comments by August 31, 1987. <br />A camera-ready copy of a complete final report shall be provided by <br />September 30, 1987. The fi nal report shall cover work done hereunder <br />disclosing all such work and all data and information obtained and <br />results achieved in performance of the contract including conclusions <br />and recommendations derived therefrom. Such report shall include a <br />complete disclosure of all technical data relevant to the equipment per- <br />formed, the techniques developed, the investigations made, and technical <br />data relevant to the materials studied and methods and processes <br />employed. The Contractor need not repeat in the final report infor- <br />mation already included in the Interim Progress Reports. A summariza- <br />tion and necessary cross reference shall be sufficient. The report <br />shall be in such full, clear, concise, and exact terms as to enable any <br />qualified person to carry out recommendations made in the report and to <br />reproduce any equipment and processes employed and to use such equipment <br />or processes by application of the most advanced state-of-the-art devel- <br />oped in the performance of the contract. <br /> <br />F-2.6 TECHNICAL <br /> <br />Technical reports for each element or individual part of the work that <br />can be readily singled out, including general or specific aspects of <br />each individual part or element, shall be submitted in draft form for <br />review and approval. Refer to No. H-I0 of the Special Contract <br />Requirements. Upon acceptance by the Contracting Officer, 10 copies <br />shall be provided. Subjects of reports shall include, but not be <br />limited to, unique ideas that may develop during performance of the <br /> <br />F-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.