My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WMOD00204
CWCB
>
Weather Modification
>
Backfile
>
WMOD00204
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:28:36 PM
Creation date
10/1/2006 2:16:00 PM
Metadata
Fields
Template:
Weather Modification
Contract/Permit #
#92-3
Applicant
North American Weather
Project Name
Willow Creek Basin
Date
11/1/1992
Weather Modification - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />COLORADO <br />WEATHER MODIFICATION PERMIT <br /> <br />Permit No. 92-3 <br /> <br />PERMIITEE: <br /> <br />North American Weather Consultants <br />1293 West 2200 South <br />Salt Lake City, Utah 84119-3500 <br /> <br />LICENSED OPERATORS: <br /> <br />John R. Thompson <br />Danny A Risch <br /> <br />PERMIITED PROJECT: <br /> <br />Commercial seeding operation of winter storm clouds <br />from ground based cloud nuclei generators from <br />November 1 through May 31. The target area is <br />described in the 'Terms and Conditions" herein. <br /> <br />PERIOD OF PERMIT: <br /> <br />Final approval is hereby given for operations from <br />November 26, 1992 through May 31, 1993, with <br />conditional approval given for future year's operations <br />from November 1 through May 31 of 1993-94, 1994-95, <br />1995-96, and 1996-97, subject to the permit renewal <br />requirements of section 36-20-114(2), c.R.S., and of the <br />Colorado Weather Modification Rules and Regulations, <br />2 CCR 401-1. This permit shall automatically terminate <br />no later than April 1, 1997. -- <br /> <br />TERMS AND CONDITIONS <br /> <br />This permit is limited by and subject to the following terms and conditions: <br /> <br />1. The project must be carried out in conformity with the operational plan <br />attached hereto as Exhibit A <br /> <br />2. The project target area shall be the Willow Creek drainage basin above <br />Willow Creek Reservoir in Grand County, Colorado (see map in Exhibit A). <br />The areas reasonably expected to be affected by the project are those areas <br />above approximately 9,000' M.S.L. inside and immediately adjacent to the <br />target area, as shown on the map in Exhibit A, and the uppermost ridges <br />immediately downwind of the target area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.