My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WMOD00203
CWCB
>
Weather Modification
>
Backfile
>
WMOD00203
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:28:36 PM
Creation date
10/1/2006 2:16:00 PM
Metadata
Fields
Template:
Weather Modification
Applicant
Western Kansas Groundwater Management
Project Name
Cloud Seeding
Date
4/15/1984
Weather Modification - Doc Type
License & Permits
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. . <br /> <br />WEATHER MODIfICATION PERMIT <br /> <br />WY 84-3 <br />Page 4 <br /> <br />b. The Executive Director orders suspension of seeding activity <br />over Colorado. <br /> <br />7. Safeguards against hazardous effects, Paragraph 6.D, <br />Dperational Plan, shall be followed. <br /> <br />8. Applicant shall submit reports on cloud seeding activity: <br /> <br />a. form WM3 - indIcating dates and hours of all seeding flights <br />over Colorado and the intended results bl-weekly: <br /> <br />to the Department of Natural Resources <br /> <br />b. A summary of form WM3 indicating on which days and overwhich <br />counties in Colorado seeding flights occured and the <br />intended results bi-weekly: <br /> <br />to the Department of Natural Resources <br />to newspapers in Cheyenne, Kiowa, Prowers and Baca Counties <br /> <br />c. As specified in C.R.S. 36-2D-117(3) a written final <br />operational report, evaluating the project, or an annual <br />operational report and an annual project evaluation, as the <br />case may be. A final operational report along with a <br />preliminary scientific evaluatIon of the project shall be <br />filed no later than thirty days after the completion of the <br />project. A final complete scientifIc evaluation of the <br />project shall be filed no later than one hundred eighty days <br />after the completion of the project. An annual summary <br />report shall be filed sixty days prior to the renewal of a <br />permit under the provisions of C.R.S. 36-20-114(2). All <br />such reports are pUblic records subject to the provisions <br />and limitations of part 2 of article 72 of title 24, C.R.S.: <br /> <br />To the Executive Director of the Department of Natural <br />Resources <br /> <br />lD. To comply with the minimum guidelines for coordination of this <br />project wIth other State weather modification projects the Applicant <br />shall: <br /> <br />a. notify any other operator authorized to modify the weather <br />in the State during the designated time period before and <br />after cloud seeding operations. (At the time of granting <br />this permit, no other seeding operations are planned in <br />Colorado during the dates of this project.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.