My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WMOD00094
CWCB
>
Weather Modification
>
Backfile
>
WMOD00094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:27:49 PM
Creation date
10/1/2006 2:12:46 PM
Metadata
Fields
Template:
Weather Modification
Contract/Permit #
#84-3
Applicant
Western Kansas Groundwater Management
Project Name
Cloud Seeding
Date
4/15/1984
Weather Modification - Doc Type
License & Permits
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />WEATHER MODIfICATION PERMIT <br /> <br />WY 84-3 <br />Page 4 <br /> <br />b. The Executive D1rector orders suspension of seeding activity <br />over Colorado. <br /> <br />7. Safeguards against hazardous effects, Paragraph 6.0, <br />Operational Plan, shall be followed. <br /> <br />B. Applicant shall submit reports on cloud seeding act1vity: <br /> <br />a. Form WM3 - indicating dates and hours of all seeding flIghts <br />over Colorado and the intended results bi-weekly: <br /> <br />to the Department of Natural Resources <br /> <br />b. A summary of form WM3 indicat1ng on which days and overwh1ch <br />count1es 1n Colorado seed1ng flights occured and the <br />intended results bi-weekly: <br /> <br />to the Department of Natural Resources <br />to newspapers in Cheyenne, K10wa, Prowers and Baca Count1es <br /> <br />c. As specified In C.R.S. 36-20-117(3) a wr1tten final <br />operat10nal report, evaluat1ng the project, or an annual <br />operational report and an annual project evaluation, as the <br />case may be. A f1nal operat10nal report along w1th a <br />preliminary scientific evaluation of the project shall be <br />filed no later than th1rty days after the completion of the <br />project. A final complete scientific evaluat10n of the <br />project shall be filed no later than one hundred eighty days <br />after the complet10n of the project. An annual summary <br />report shall be filed sixty days prior to the renewal of a <br />perm1t under the provis1ons of C.R.S. 36-20-114(2). All <br />such reports are public records subject to the provisions <br />and limitat10ns of part 2 of article 72 of t1tle 24. C.R.S.: <br /> <br />To the Executive Director of the Department of Natural <br />Resources <br /> <br />10. To comply w1th the m1nimum guidelines for coordination of this <br />project with other state weather modification projects the Applicant <br />shall: <br /> <br />a. notify any other operator authorized to modify the weather <br />1n the State dur1ng the des1gnated t1me period before and <br />after cloud seeding operations. (At the time of granting <br />th1s permit, no other seeding operat10ns are planned in <br />Colorado dur1ng the dates of this project.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.