Laserfiche WebLink
<br />-1 <br />l <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Table 4-1 <br /> <br />Water Content of the Snowpack at Three Snowcourse Sites <br />For Project Duration as Reported by the <br />Natural Resources Conservation Service <br /> <br />TARGET SNOWCOURSES WILLOW GRANDY STILLWATER AVERAGE <br /> CREEK PASS CREEK <br />DEC 1 NORMAL 3.3 NA 0.7 2.0 <br /> OBSERVED 1.9 NA 1.0 1.5 <br /> % NORMAL 58 - 143 75 <br />JAN 1 NORMAL 5.7 NA 2.4 4.1 <br /> OBSERVED 3.3 NA 1.5 2.4 <br /> % NORMAL 58 NA 63 59 <br />FEB 1 NORMAL 7.3 4.7 4.5 5.5 <br /> OBSERVED 5.9 3.0 4.3 4.4 <br /> % NORMAL 81 64 96 80 <br />MARCH 1 NORMAL 9.2 6.4 7.0 7.5 <br /> OBSERVED 11.6 3.7 6.6 7.3 <br /> % NORMAL 126 58 94 97 <br />APRIL 1 NORMAL 12.1 7.2 7.7 9.0 <br /> OBSERVED 12.6 4.3 7.3 8.1 <br /> % NORMAL 105 60 95 90 <br />MAY 1 NORMAL 13.5 4.2 1.2 6.3 <br /> OBSERVED 16.9 3.6 2.3 7.6 <br /> % NORMAL 125 86 192 121 <br /> <br />4.3 Operational Seedinl! Summary <br /> <br />During the project six-month operational period, 31 stonn events were seeded, <br />with seeding releases made on a total of 52 days. A cumulative 2,146 hours of ground <br />generator operation were logged, during which a total of 17,166 gm (37.81b) of silver <br />iodide was dispensed. Table 4-2 lists the seeded stonn periods. <br /> <br />4-3 <br />