My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WMOD00034
CWCB
>
Weather Modification
>
Backfile
>
WMOD00034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:27:26 PM
Creation date
10/1/2006 2:11:33 PM
Metadata
Fields
Template:
Weather Modification
Contract/Permit #
#94-6
Applicant
North American Weather
Project Name
Willow Creek Basin
Date
11/1/1994
Weather Modification - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,-I <br />1 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />\ <br />I <br />I <br />I <br />I <br />) <br />I <br /> <br />4.0 OPERATIONS <br /> <br />The program was operational from November 1, 1994 through April 30, 1995. <br />There were a total of 31 stonn periods that were seeded during this period on portions <br />of 52 days. Overall, this was an above-nonnal period of frequent stonn systems. <br />Precipitation amounts however were below nonnal for most of the project period, with <br />some sites reaching above nonnal by the end of April 1995. <br /> <br />4.1 Onerational Procedures <br /> <br />A NA WC meteorologist monitored the local weather on a day to day basis, using <br />NWS infonnation. A short-tenn forecast was developed and updated by the <br />meteorologist with emphasis on weather systems that would be favorable for cloud <br />seeding opportunities. Wind directions and speeds, temperature structure of the <br />atmosphere and precipitation possibilities were the crucial factors forecast on the <br />program. A daily logbook was maintained which briefly described weather conditions <br />and program activities. <br /> <br />When a potentially seedable weather situation was identified by the meteorologist, <br />the monitoring of weather conditions would intensify. As the weather system approached <br />the target area, a seeding schedule was developed by the meteorologist, indicating which <br />CNGs to activate and at what time. If a detennination on when to end the CNG operation <br />could be made at the beginning of the stonn period, then the CNG operator was given <br />this infonnation along with the times that the CNGs were to be activated. However, a <br />detennination of when to end the seeding operations usually was not made until later in <br />the stonn episode. <br /> <br />The CNG operators were contacted no more than 12 to 18 hours before the CNG <br />needed to be activated. Frequently, the activation time was within an hour of the <br />operator being contacted. The length of CNG operation varied greatly from stonn to <br /> <br />4-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.