Laserfiche WebLink
<br />. <br /> <br />Weather Modification Permit <br /> <br />WY 86-2 <br />Page 3 <br /> <br />9, The project is conceived to provide and offers promise of providing <br />~conomic benefit to the area In which the operation will be <br />conducted. <br /> <br />10. The project can be reasonably expected to benefit people in the area <br />and benefit the people of the State of Colorado, <br /> <br />11, The project is scientifically and technically feasible, <br /> <br />12, The project does not involve a high degree of risk of substantial <br />harm to land, people, health, safety, property, or the environment. <br /> <br />13, The project. under the terms and conditions of the permit. is <br />designed to include adequate safeguards to prevent substantial harm <br />to land. people, health, safety, property, or the environment, <br /> <br />14, The project, under the terms and conditions of the permit, will not <br />adversely affect other weather modification projects, <br /> <br />. <br /> <br />15, The project is designed to minimize risk and maximize scientific <br />gains or economic benefits to the residents of the area or to the <br />State of Colorado. <br /> <br />TERMS AND CONDITIONS <br /> <br />The permit is subject to the following terms and conditions: <br /> <br />1. Effective dates are 1 November 1985 through 31 March 1986, <br /> <br />2, fhe project target area is limited to the Vall and Beaver Creek Ski <br />Areas, Areas that might be affected include eastern Eagle County <br />and extreme western Summit County as shown on the map submitted with <br />the application for permit. <br /> <br />3. Clouds to be seeded will be selected according to the meteorological <br />and cloud phYsics parameters shown in Attachment B. Procedures for <br />determining seeding rate are on file with the DNR. <br /> <br />4. Seeding will be conducted only under conditions when seedIng is <br />likely to be beneficial. <br /> <br />-- <br /> <br />S. Although no significant impacts from seeding are expected to occur <br />in Lake County, operations shall be carefully controlled to avoid <br />increasing snow in Lake County. The operator will submIt details on <br />the plan designed to achieve this .result. <br />