Laserfiche WebLink
<br /> CENTRAL COLORADO PROGRAM OPERATIONAL SUMMARV <br /> -- <br /> No. Generators Total Seeding Seeding Rate Total Silver <br /> Operational Period Operated Hours in Qm/hr Iodida Output <br />1. 2-21-77/2100 hrs to 2-23-77/1000 hrs 18 461-1/12 hrs 20 9221 gms <br />.2. 2-23-77/2130 hrs to 2-24-77/1500 hrs 8 136-1/2 20 2730 <br />3. 3-3-77/1030 hrs to 3-3-77/2000 hrs 11 95 10 951 <br />'4. 3-9-77/2100 hrs to 3-11-77/1030 hrs 20 687-11/12 20 & 10 9466 <br />5. 3-17-77/0600 hrs to 3-18-77/1000 hrs 18 421-1/4 20 & 10 5056 <br />6. 3-18-77/2000 hrs to 3-19-77/0900 hrs 18 234-1/4 10 2343 <br />7. 3-20-77/1000 hrs to 3-21-77/0800 hrs 14 306-1/2 10 3066 <br />8. 3-25-77/0600 hrs to 3-26-77/0800 hrs 10 260-3/4 20 5215 <br />9. .3-27-77/2200 hrs to 3-28-77/1000 hrs 13 157-1/2 10 1575 <br />10. 3-31-77/1230 hrs to 4-1-77/1700 hrs 10 179-3/4 10 1798 <br />11. 4-4-77/0930 hrs to 4-5-77/1600 hrs 11 186 ' 20 3598 <br />12. 4-11-77/1030 hrs to 4-11-77/2030 hrs 8 80 40 3200 <br />13. 4-12-77/1000 hrs to 4-12-77/2100 hrs 9 85-1/2 20 1710 <br />14. 4-13-77/1100 hrs to 4-13-77/1930 hrs 10 81-1/6 20 1534 <br />15. 4-15-77/0600 hrs to 4-16-77/0930 hrs 7 192-1/2 20 3850 <br />16. 4-19-77/2130 hrs to 4-20-77/1900 hrs 15 220-1/4 20 4405 <br />17. 5-13-77/2200 hrs to 5-15-77/2200 hrs 15 501-3/4 20 & 10 8755 <br /> 4287-2/3 hrs 68/+73 gms <br />-- Post-season calculations of silver iodide solution consumption by the generators for the requested <br /> solution flow rates prior to 3-24-77 would indicate that the 20 gm/hr rate was actually about 30 <br /> gm/hr and the 10 gm/hr was about 15 gm/hr. On 3-24-77 , adjustments were made t~ our raQuested <br /> solution flow rates for seeding. After 3-24-77, the 10 gm/hr rate was correct but the 20 gm/hr <br />rate was still actually closer to 25 gm/hr. <br />