Laserfiche WebLink
<br />t <br />. <br />. <br />t <br />t <br />t <br />. <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />, <br />. <br />. <br />. <br />. <br />I <br />I <br />. <br />I <br />I <br />I <br />, <br />, <br />. <br />. <br />. <br />. <br />. <br />. <br />I <br />I <br />I <br /> <br />TIlE DEVELOP~IENT, CONDUCT AND EVALUATION <br />Of A CLOUD SEEDING PROGRA~I <br />fOR GUNNISOi'o' COUNTY, COLORADO <br />2003-2004 WINTER SEASON <br /> <br />1.0 INTRODUCTION <br /> <br />North American Weather Consultants (NA We) conducted a five month winter cloud <br />seeding program for the upper Gunnison River watersheds above Blue Mesa Reservoir from <br />November 15. 2003 through April 15. 2004, \vhich is the second winter season of project <br />operations. NA we had been contacted in the fall of 2002 regarding the design and conduct of a <br />program within Gunnison County. A program \vas designed. including the preparation of a <br />feasibility study, and a permit obtained for the program from the Colorado Water Conservation <br />Board. That initial program was operated from February I through April 15, 2003 (Griffith, et <br />ai, 2003). The program sponsors requested that the intended target area be expanded from only <br />those drainages above 9000' in Gunnison County to include '....atersheds that had their headwaters <br />in adjoining counties to the south. Figure I. I provides the location of this expanded area. <br />NA we submitted an application for a new five year permit to include these areas of interest in <br />the program. The Colorado Water Conservation Board (CWCB) held a public hearing in <br />Gunnison on this application on October 9, 2003. The ewes granted a five year permit to <br />NA WC for the new addition to the earlier target area on November 20, 2004. CWeB personnel <br />gave NA WC verbal approval to begin seeding on November 15th. <br />NA we installed an additional nine cloud seeding generator sites for the 2003.2004 <br />'....inter season to cover the expanded larget area, bringing the (Otal number of generators to <br />twcnty.seven. Twenty different storm periods were seeded during the five months of the seeding <br />operations. The following sections describe this season's operations and evaluation of <br />effectiveness in more detail. <br />